Presentation is loading. Please wait.

Presentation is loading. Please wait.

Proposed changes to the v Draft

Similar presentations


Presentation on theme: "Proposed changes to the v Draft"— Presentation transcript:

1 Proposed changes to the 802.11v Draft
Month Year July 2006 Nov 2006 Proposed changes to the v Draft Authors: Date: Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures < ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at Cha et al. Jokela et al

2 Agenda Overview Proposed changes Comments Nov 2006 Month Year
July 2006 Nov 2006 Agenda Overview Proposed changes Comments Cha et al. Jokela et al

3 Overview Objective Motivations
Month Year July 2006 Nov 2006 Overview Objective To reduce the time to acquire FBMS and achieve the efficient power saving operation Motivations A client may already use multicast service prior to entering WLAN e.g., Roaming between WLAN and other mobile networks (vertical handoff) A client may want to use multicast service immediately after turned on Reducing control overhead, time to acquire FBMS, efficient power saving, To allow an STA to acquire FBMS at association stage, it is possible to reduce the time to acquire FBMS and achieve the efficient power saving operation Cha et al. Jokela et al

4 Nov 2006 Proposed Changes Allow Association request/response frame to include FBMS request IE/FBMS response IE In effect, non-AP STA can request FBMS during Association procedure Association Request FBMS Request IE Association Response FBMS Response IE Cha et al.

5 Association Response +
Month Year July 2006 Nov 2006 Possible Flows Existing Message Flow Proposed Message Flow AP Non-AP STA AP Non-AP STA Beacon + AID 0 IE Beacon + AID 0 IE Association Request Association Request + FBMS Request IE Association Response Association Response + FBMS Response IE FBMS Request FBMS Response Cha et al. Jokela et al

6 Association Request/Response Messages
Nov 2006 Association Request/Response Messages Association Request Frame Body Association Response Frame Body Order Information 10 Wireless Network Management Capability 11 FBMS Request 1112 Supported Regulatory Classes Order Information 8 Wireless Network Management Capability 9 FBMS Response 910 Supported Regulatory Classes Cha et al.

7 Comments The following modification of text is necessary
Nov 2006 Comments The following modification of text is necessary Peer-to-Peer Link Event Log Report The purpose of the RSNAPeer-to-Peer Link Event Log report is to provide the AP with a historical view of the previous peer to peer connectivity. Syslog Event Log Report The purpose of the RSNASyslog Event Log report is to provide the AP with a vendor specific event log or “human” readable log for a given client STA. Cha et al.

8 Nov 2006 Questions/Feedback Cha et al.

9 Month Year July 2006 Nov 2006 Motion Move to include normative text in document v-Proposed changes to the v into the TGv draft. Mover: Seconder: Results: Cha et al. Jokela et al


Download ppt "Proposed changes to the v Draft"

Similar presentations


Ads by Google