Presentation is loading. Please wait.

Presentation is loading. Please wait.

TGn Closing Report - January

Similar presentations


Presentation on theme: "TGn Closing Report - January"— Presentation transcript:

1 TGn Closing Report - January
doc.: IEEE /1531r0 January 2005 TGn Closing Report - January Date: Authors: Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures < ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at Bruce Kraemer, Conexant Bruce Kraemer, Conexant

2 January Activities Administrative introduction
doc.: IEEE /1531r0 January 2005 January Activities Administrative introduction Elect vice chair - Sheung Li Revised technical presentations (2hr block) Technical comparison , clarifications, discrepancies Presentation time, random speaker sequence for each round Request 20 min for Q&A and/or submit questions via 4 Comparison & Market Application Presentations 10 Technical presentations Q&A Preliminary planning for Coexistence Assurance with .19 Down select vote Plans for March Bruce Kraemer, Conexant Bruce Kraemer, Conexant

3 X Jan 17 Jan 18 Jan 19 Jan 20 TGn - January Schedule
Time Monday Tuesday Wednesday Thursday 8:00-10:00 X Technical/Comparison Presentations .19 discussion Regency II 10:30-12:30 MitMot Proposal Presentations Q&A 1:30-3:30 WWiSE Proposal Presentations ½ hour each Down Select at 1:30 PM 4:00-6:00 Opening, Agenda Minutes, Comparison Presentations TGnSync Proposal Presentations Presentations March plans Presentation 7:30-9:30 Election, Various Comparison Presentations Bruce Kraemer, Conexant

4 Technical/Comparison Presentations
January 2005 Technical/Comparison Presentations Non-proposal authors , Field Measurements of 2x2 MIMO Communications, Babak Daneshrad , TGn Consensus Proposal, Tim Wakeley , Service Provider Requirements, Brian Ford , Required Feature set for Closed Loop Beam Forming, Aryan Saed Bruce Kraemer, Conexant

5 Technical/Comparison Presentations by
January 2005 Technical/Comparison Presentations by Monday Closed vs Open Loop Comparisons, John Ketchum – ACI Results, Dave Hedberg Tuesday Comparison of Value of proposed MAC features, Adrian Stephens – Backward Compatibility of CDD Preambles, - Tsuguhide Aoki – Preamble Power Variations, Dave Hedberg – WWiSE Pilot Performance, Allert van Zelst – Impact of Fewer Pilot Tones on .11n Phy Perf, Won-Joon Choi – STS Compatibility with Legacy g devices, Chris Hansen Wednesday – Preambles and MIMO Beam Forming , John Sadowsky – Preambles, Beam Forming for WWiSE, Chris Hansen Bruce Kraemer, Conexant

6 Ballot Results Proposal MITMOT Proposal TGnSync Proposal WWiSE
January 2005 Ballot Results Proposal MITMOT Proposal TGnSync Proposal WWiSE Consider # Consider % 23 9.62 132 55.23 84 35.15 Bruce Kraemer, Conexant

7 Tentative TGn Plans for March
January 2995 doc.: IEEE /1531r0 January 2005 Tentative TGn Plans for March Technical Proposal Updates & FR (CC)10 days before meeting Friday March 4 questions to proposal authors Tuesday March 8 Written responses posted to server Friday March 11 Administrative introduction (1 hr) Comparison reports (1 hr) Market/application reports (.5hr) Proposal presentations (1 to 2hr blocks) Technical comparison , clarifications, discrepancies Presentation time, random speaker sequence for each round Additional technical presentations (3hr) .19 presentations on Coexistence Assurance (1hr if possible) Q&A 4 hr (2hr written + 2hrs live, separate time for non-aligned) Down select vote - special order (1 hr) Confirmation vote- as much of step 17 as possible in March Elect Technical editor (½ hour) Plans for May (1/2 hour) Bruce Kraemer, Conexant Bruce Kraemer, Conexant

8 January 2005 End Bruce Kraemer, Conexant


Download ppt "TGn Closing Report - January"

Similar presentations


Ads by Google