Presentation is loading. Please wait.

Presentation is loading. Please wait.

TGT Wireless Performance WG Report

Similar presentations


Presentation on theme: "TGT Wireless Performance WG Report"— Presentation transcript:

1 TGT Wireless Performance WG Report
Nov 2004 TGT Wireless Performance WG Report (4 slides) C. Wright, Azimuth Systems

2 TGT Report Total meeting time: 14 hours Good strong attendance Plans:
Nov 2004 TGT Report Total meeting time: 14 hours Good strong attendance Plans: Appoint permanent secretary, editor Tom Alexander appointed editor Several volunteers for secretary, but none permanent Hear technical presentations C. Wright, Azimuth Systems

3 Progress during the week
Nov 2004 Progress during the week We heard many good technical presentations Much excellent discussion of framework continued We are starting to really get into details of metrics and methodologies now C. Wright, Azimuth Systems

4 Presentations Updates in Red
Nov 2004 Presentations Updates in Red 11-04/1203r1 – “Proposed template for TGT draft”, Alexander 11-04/1419r0 – “A Taxonomy of Metrics”, Alexander 11-04/1420r0 – “Link layer metrics proposal”, Alexander 11-04/1402r0 – “Traceable Measurements of PHY Layer Performance”, Foegelle 11-04/1473r0 – “Application Throughput Measurements and Predictions using site-specific information”, Rappaport 11-04/1222r1 – “Measurement Methodology Based on Approved Framework”, Pirzada 11-04/1476r0 – “A Proposed Controlled Open Air Test Methodology”, Kobayashi 11-04/1441r0, “TGt/WNM Collaboration”, Kwak 11-04/1397r0 – “Rate vs. Range Test Methodology”, Fanny Mlinarsky 11-04/1466r0, “Some Concepts of Rate Management Testing”, Wilhoyte TG meeting slides and report, 11-04/1389r3 TG minutes, 11-04/1526r0 C. Wright, Azimuth Systems

5 Telconferences Planned
Nov 2004 Telconferences Planned TGT is asking for a WG motion to approve teleconferences conducted starting two weeks hence to two weeks after the November plenary Will be presented in the blanket telecon motion Thursdays, 12 noon Eastern Time, weekly Phone info to be posted on reflector First telecon will be December 2nd C. Wright, Azimuth Systems

6 Welcome to TGT Evaluation of 802.11 Wireless Performance
Nov 2004 Welcome to TGT Evaluation of Wireless Performance Charles R. Wright C. Wright, Azimuth Systems

7 IEEE-SA Standards Board Bylaws on Patents in Standards
Nov 2004 IEEE-SA Standards Board Bylaws on Patents in Standards 6. Patents IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard. This assurance shall be provided without coercion and prior to approval of the standard (or reaffirmation when a patent becomes known after initial approval of the standard). This assurance shall be a letter that is in the form of either a) A general disclaimer to the effect that the patentee will not enforce any of its present or future patent(s) whose use would be required to implement the proposed IEEE standard against any person or entity using the patent(s) to comply with the standard or b) A statement that a license will be made available without compensation or under reasonable rates, with reasonable terms and conditions that are demonstrably free of any unfair discrimination This assurance shall apply, at a minimum, from the date of the standard's approval to the date of the standard's withdrawal and is irrevocable during that period. Approved by IEEE-SA Standards Board – December 2002 C. Wright, Azimuth Systems

8 Inappropriate Topics for IEEE WG/TG/SG Meetings
Nov 2004 Inappropriate Topics for IEEE WG/TG/SG Meetings Don’t discuss licensing terms or conditions Don’t discuss product pricing, territorial restrictions or market share Don’t discuss ongoing litigation or threatened litigation Don’t be silent if inappropriate topics are discussed… do formally object. If you have questions, contact the IEEE Patent Committee Administrator at Approved by IEEE-SA Standards Board – December 2002 C. Wright, Azimuth Systems

9 A Friendly Reminder… Don’t forget to log your attendance!
Nov 2004 A Friendly Reminder… Don’t forget to log your attendance! Attendance server problems? Talk to Harry Worstell C. Wright, Azimuth Systems

10 Proposed Agenda for San Antonio Meetings (1/2)
Nov 2004 Proposed Agenda for San Antonio Meetings (1/2) Chair comments Appoint secretary Approval of agenda Approve minutes Berlin 11-04/1166r0 Call for presentations (in order specified) 11-04/1203r1 – “Proposed template for TGT draft”, Tom Alexander, 15 min 11-04/1419r0 – “A Taxonomy of Metrics”, Tom Alexander, 15 min 11-04/1420r0 – “Link layer metrics proposal”, Tom Alexander, 45 min 11-04/1402r0 – “Traceable Measurements of PHY Layer Performance”, Michael Foegelle, 45 min 11-04/1397r0 – “Rate vs. Range Test Methodology”, Fanny Mlinarsky, 20 min 11-04/1222r1 – “Measurement Methodology Based on Approved Framework”, Fahd Pirzada, 45 min (9 AM Wednesday, discussion extended to Thursday, 10:30 AM, for ½ hour) 11-04/1476r0 – “A Proposed Controlled Open Air Test Methodology”, Mark Kobayashi, 45 min 11-04/xxxx – Second usage scenario (multimedia/streaming), Fahd Pirzada (withdrawn by presenter) C. Wright, Azimuth Systems

11 Proposed Agenda for San Antonio Meetings (2/2)
Nov 2004 Proposed Agenda for San Antonio Meetings (2/2) Appointment of editor Chair comments / progress from telecons This document – “Short Refresher on Standards Development in ” Discussion: 11-04/863r2 “Test Plan Template,” and proposal requirements and selection criteria Presentations Given in the order listed above New Items / Any other Business Approve minutes from last telecon, 11-04/1417r0 Planning for January meeting 11-04/1466r0, “Some Concepts of Rate Management Testing”, Mike Wilhoyte 11-04/1397r0 – “Rate vs. Range Test Methodology”, Fanny Mlinarsky, 20 min (moved from previous place on agenda due to conflicts) Other Task Group motions Standing Orders: 5:00 PM Thursday – any late votes that must meet the 4-hour rule C. Wright, Azimuth Systems

12 Meeting Schedule for week
Nov 2004 Meeting Schedule for week Monday Tuesday Wednesday Thursday 8:00 TGT TGT 10:00 10:30 30 minute recess TGT TGT 12:30 Lunch 1:30 TGT 3:30 4:00 Closing business, motions at 5:00 pm 6:00 Dinner 7:30 Opening, confirm editor, secretary, writing drafts, template discussion 9:30 C. Wright, Azimuth Systems

13 Timeline Going Forward
Nov 2004 Timeline Going Forward August 16 (?) NESCOM Approval! September meeting First meeting as a TG Technical Presentations! November Proposals for inclusion into draft January March Review of draft in preparation for LB We are here! C. Wright, Azimuth Systems

14 Progress since Berlin Held six teleconferences Presentations/notes:
Nov 2004 Progress since Berlin Held six teleconferences Presentations/notes: t-bottom-up-evaluation performance-testing.ppt t-measurement-methodology-proposal-based-approved-framework.ppt t-link-layer-metrics-proposal-tgt.ppt t-rate-vs-range-test-methodology.ppt C. Wright, Azimuth Systems

15 A Short Refresher on Standards Development in 802.11
Nov 2004 A Short Refresher on Standards Development in C. Wright, Azimuth Systems

16 50,000 foot view of the process
Nov 2004 50,000 foot view of the process Call for Interest (9.1.1) Study Group (9.1.2) Task Group (9.1.3) Working Group Ballot (9.1.4) Sponsor Ballot (9.1.5) Standards Board Approval (9.1.6) Publication (9.1.7) Paragraph references are from Policies and Procedures, 11-04/510r0 We are here 2 months to 1 year 2 months to 4 years 2 months to 1 year 1 to 3 months C. Wright, Azimuth Systems

17 How to write a draft Write a proposal
Nov 2004 How to write a draft Write a proposal Describe in a MSWord document a list of “instructions to the editor” (aka “draft normative text”). For whole new sections, this will be 100% new text/figures. Create Powerpoint presentation based on above to describe salient details Submit both docs to server at least 4 session hours before intent to vote on proposal The “4-hour rule” is part of rules and is strenuously enforced Why? It gives people time to read, understand and consider the proposal TGT can also rule that longer period of time is required Helpful to announce existence of the documents through the reflector Make presentation before the group Make motion to accept proposal (the “draft normative text”) into the draft 75% majority required for any changes to a draft (additions/changes/deletions) If approved by group, editor will incorporate into the draft C. Wright, Azimuth Systems

18 Another way to write a draft
Nov 2004 Another way to write a draft Have an open discussion of some aspect of the draft Ask editor if the direction is clear If answer is “yes,” editor is empowered to make the necessary changes Approve by a vote the outcome, expressed as a written motion Both methods are acceptable under the right circumstances! C. Wright, Azimuth Systems

19 802.11 process for draft approval
Nov 2004 process for draft approval Policies & Procedures 11-04/510r0, §9.1.4 C. Wright, Azimuth Systems

20 What happens in Sponsor Balloting?
Nov 2004 What happens in Sponsor Balloting? Voters in the “Sponsor Pool”: Review draft Make comments Vote Task Group must Resolve these comments Create revised draft Submit for another round of review and voting Process follows similar flow chart as on previous slide Sponsor Ballot pool formed by WG chair from interested individual members of IEEE Standards Association (SA) C. Wright, Azimuth Systems

21 Nov 2004 Rules about Drafts Offical drafts are owned by IEEE and available only to Voting members (through meeting attendees ( at the meeting only In other words, you will need to be a voting member or come to the meetings to get current copies of the draft! C. Wright, Azimuth Systems

22 Slides created during the meeting
Nov 2004 Slides created during the meeting C. Wright, Azimuth Systems

23 Nov 2004 Straw Poll #1 Is the group in favor of accepting document 11-04/1203r1 as the starting point for the TGT draft, provided clauses 5,6,7,8 are deleted? Yes: 16 No: 0 C. Wright, Azimuth Systems

24 Questions from IETF BMWG
Nov 2004 Questions from IETF BMWG These questions will be considered in detail during a future telecon: Minimize the radio-specific aspects of the testing, and hence minimize the variability of the results. The Signal to Noise Ratio Section (3.5.9) is primarily where the topic is addressed, - but there are other key points throughout Section 3.5 Test Conditions. I'm interested to know if the committee members agree that the repeatability goal was achieved in Tom & Scott's draft C. Wright, Azimuth Systems

25 Nov 2004 New Business C. Wright, Azimuth Systems

26 Motion Motion to Empower TGT to hold Telecons Yes: 3 No: 0 Abstain: 0
Nov 2004 Motion Motion to Empower TGT to hold Telecons Date: Thursdays Time: 12 noon Eastern time Duration: 1 hour Next: Dec 2, 2004 Yes: 3 No: 0 Abstain: 0 C. Wright, Azimuth Systems

27 Upcoming Telecon Schedule
Nov 2004 Upcoming Telecon Schedule 15 16 17 18 19 Dec 2 Telecon Dec 9 Telecon Dec 16 Telecon Dec 23 Dec 30 Jan 6 Telecon Jan 13 Telecon Thanksgiving (USA) 802 Plenary San Antonio Interim Monterey During the Dec 16 telecon, we will decide whether there is enough interest in having telecons on Dec 23 and Dec 30 C. Wright, Azimuth Systems

28 Nov 2004 Backup Information C. Wright, Azimuth Systems

29 Teleconference Info Date: Thursdays Time: 12 AM Eastern time (1600 UT)
Nov 2004 Teleconference Info Date: Thursdays Time: 12 AM Eastern time (1600 UT) Duration: 1 hour Phone #  International: Passcode: Next: December 2, 2004 C. Wright, Azimuth Systems

30 Email Reflector Original reflector: stds-wpp@ieee.org
Nov 2004 Reflector Original reflector: Set up under aegis of EMC Society reflector: Requires membership to send to it Can be monitored through web site rules require all SG communication to be through reflector Use of WPP reflector will be discontinued after March meeting C. Wright, Azimuth Systems

31 References for 802.11 Newcomers (1 of 2)
Nov 2004 References for Newcomers (1 of 2) Web site: Document server: Sign up for an account No need to be an member to get an account Once logged in, “join” : Click on “ WLAN WG” on left In center window, choose to become a new member Click again on “ WLAN WG” An additional subitem called “Documents” will be revealed – click on it You’ve reached the document server! C. Wright, Azimuth Systems

32 References for 802.11 Newcomers (2 of 2)
Nov 2004 References for Newcomers (2 of 2) Document numbering scheme WG-YY-NNNN-RR-gggg-English-document-title.ext WG = 802 working group number, e.g. “11” as in YY = two digits of year NNNN = document number RR = document revision number gggg = group to which the document pertains Example: wpp-telecon-agenda-19-feb-04.ppt C. Wright, Azimuth Systems


Download ppt "TGT Wireless Performance WG Report"

Similar presentations


Ads by Google