Presentation is loading. Please wait.

Presentation is loading. Please wait.

Using PDA in “producer price index for manufacture section” project

Similar presentations


Presentation on theme: "Using PDA in “producer price index for manufacture section” project"— Presentation transcript:

1 Using PDA in “producer price index for manufacture section” project

2 Objectives: Deliberation PDA hardware and software
Deliberation maps and using GPS Deliberation questionnaire, data transfer, Speed of work, accuracy, …

3 Training course: Instruction about statistical project
Instruction about PDA hardware Instruction about map and software Instruction about GPS Field operation

4 Location of samples on the map

5 Addresses

6 Pages of questionnaire
ماه سال روز استان شهرستان شهر/دهستان رديف كارگاه Date Location

7 Workshop Central Office
كارگاه آدرس تلفن دفتر مركزي Workshop Central Office

8 Replier Price Information
مشخصات كالا ورود اطلاعات Replier Price Information

9 Position & Time (GPS) X Y T 546741.91867355 3956273.1871116
12/02/ :39:23 Õ Position & Time (GPS)

10 Supervising areas

11 Enumeration areas

12 Transferring the data 1-Transferring stored data on PDAs through connecting them to the web site of the SCI via the Web. 2-Collecting stored data by returning enumerators' PDAs to the SCI.

13

14 Samples of work

15 Sample of track log

16

17 Workshop and track log

18 Devices: HP6955 HP1950

19 Reasonableness checking:
Checking the validity of results and planning for finding better methods and devices for executing project were among the outcomes of PDA application.


Download ppt "Using PDA in “producer price index for manufacture section” project"

Similar presentations


Ads by Google