Jul 12, 2010 07/12/10 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: 802.15 TG10 (L2R) Closing Report.

Similar presentations


Presentation on theme: "Jul 12, 2010 07/12/10 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: 802.15 TG10 (L2R) Closing Report."— Presentation transcript:

1 Jul 12, 2010 07/12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG10 (L2R) Closing Report for Sept. 2014 Date Submitted: Sept. 2014 Source: Clint Powell, Powell Wireless Commsulting, LLC Contact: Clint Powell, Powell Wireless Commsulting, LLC Voice: , Re: TG10 (L2R) Closing Report for September 2014 Abstract: Closing Report for the TG10 (L2R) Sessions in Athens Purpose: Layer 2 (Mesh Under) Routing Notice: This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P Page 1

2 Jul 12, 2010 07/12/10 TG10 (L2R) Draft a recommended practice for Layer 2 Routing of Dynamically Changing Mesh Networks. ----- Meeting Notes (17/01/ :38) ----- Replace 1st paragraph with context for TVWS Page 2

3 Meeting Goals/Status Recap July 802.15 Plenary and Current Status
07/12/10 Meeting Goals/Status Recap July Plenary and Current Status Hear Presentations Hear Final Proposals Data and Performance Metrics Discuss Preparation for Nov / Joint Session Discuss Next Steps Review TG10 Timeline Page 3

4 Accomplishments Recap July 802.15 Plenary and Current Status
07/12/10 Accomplishments Recap July Plenary and Current Status Heard 1 Presentation Heard Final Proposals Data and Performance Metrics Discussed Preparation for Nov / Joint Session Discussed Next Steps Reviewed TG10 Timeline Page 4

5 Accomplishments (cont’d.)
Jul 12, 2010 07/12/10 Accomplishments (cont’d.) Proposal merging activities have begun Page 5

6 Jul 12, 2010 07/12/10 Minutes Minutes - doc. # Page 6

7 Looking Forward Between Now and San Antonio Mtg. in Nov.
Jul 12, 2010 07/12/10 Looking Forward Between Now and San Antonio Mtg. in Nov. Hear Proposal #4 Data and Performance Metrics Continue Process of Merging of Proposals At San Antonio Mtg. in Nov. Determine/Agree/Adopt Baseline Proposal Plan/Start Drafting Activities Next Juncture w/802.1 Participate in Joint 802.1/ Session in Nov. Mtg. Page 7

8 TG10 Conference Call Reminder
Jul 12, 2010 07/12/10 TG10 Conference Call Reminder TG10 Standing Conference Call Info Day: Thurs. Next Call: 2nd, Oct. Time: 7AM (Pacific) Conf. #: To Be Sent to TG10 Reflector Page 8