1 Upgrade to 14.2 - Project Plan

2 Current Version 11.4 11.5 12.1 12.2 (12.3) 12.4 Upgrade to 14.2
י"ז/ניסן/תשע"ט Upgrade to 14.2

3 Current Version 11.4 - all_to_14.2 11.5 “ 12.1 “ 12.2 “
(12.3) _14.2 _14.2 י"ז/ניסן/תשע"ט Upgrade to 14.2

4 Points to Consider - 1 Machines used in the Process New Machine
Separate Test Machine One Production Machine י"ז/ניסן/תשע"ט Upgrade to 14.2

5 Points to Consider - 2 Hardware Fitness Disk Space Memory
CPU performance י"ז/ניסן/תשע"ט Upgrade to 14.2

6 Project Plan - Verifying HW
Machine Production Test Server model Operating system Memory Swap size Free disk space CPU Avg. computer use CPU Top computer use ============================= Util o 14 df -k ls -l /aleph*/oradata/* י"ז/ניסן/תשע"ט Upgrade to 14.2

7 Project Plan - General Number of Supported Sites Planned target date
Size of Sites and Local Resources Duration of the process Training Plan Groups - modules sessions Sites - general sessions י"ז/ניסן/תשע"ט Upgrade to 14.2

8 Project Plan - Schedule
י"ז/ניסן/תשע"ט Upgrade to 14.2

9 Product’s Life Cycle י"ז/ניסן/תשע"ט Upgrade to 14.2

10 Project Plan - Time Param. s
Example: Medium Site Up to 100 c.u. Up to 1M documents Duration of Download and Conversion Upload Index building י"ז/ניסן/תשע"ט Upgrade to 14.2

11 Project - Main Steps 1 Planning 2 HW Analysis 3 Installation
4 Training 5 Customization 6 Test Conversion 7 Checks and Comparisons 8 Final Conversion י"ז/ניסן/תשע"ט Upgrade to 14.2

12 Pre-Installation Get pw from Customer Admin.
Get version and Oracle from ftp server dir.s: product Oracle Apache, Perl, gcc, gsort versions_500 pc_exe.14.2 version /<platform> י"ז/ניסן/תשע"ט Upgrade to 14.2

13 Installation ALEPH 14.2 + Oracle 8.0.6 installation
Localize aleph_start_505.private and *_server_defaults New license Client ftp and install Run servers Test demo libraries י"ז/ניסן/תשע"ט Upgrade to 14.2

14 Project Plan - Training
2 days new functionalities attached Group Training - 2 training days + practice Site Training same 2 days * num of sites E-learning (InterWise) י"ז/ניסן/תשע"ט Upgrade to 14.2

15 Customization Alephe tables Unicode tables Open working libraries
data_tab tables Web screens configuration י"ז/ניסן/תשע"ט Upgrade to 14.2

16 Test Conversion Confirmation from the Customer
Library continues working as usual Activate Conversion Process Process side effects Performance Disk space Upload converted data Build indexes י"ז/ניסן/תשע"ט Upgrade to 14.2

17 Test Conversion - Check
Converted data checked by the user Check list approved - attached Confirmation of the Conversion י"ז/ניסן/תשע"ט Upgrade to 14.2

18 Final Conversion Stop Library’s Updates Continue Circulation Only
Activate Conversion Process Upload Converted Data Indexes Building Stop and convert Circulation Customer final check and confirmation י"ז/ניסן/תשע"ט Upgrade to 14.2