Presentation is loading. Please wait.

Presentation is loading. Please wait.

The Family Functioning Assessment: Investigation and Safety Planning

Similar presentations


Presentation on theme: "The Family Functioning Assessment: Investigation and Safety Planning"— Presentation transcript:

1 The Family Functioning Assessment: Investigation and Safety Planning
Module 5 The Family Functioning Assessment: Investigation and Safety Planning 7.0.1

2 Agenda 7.0.3 Pre-Service CPI Specialty Module 5.0.2

3 Overview of the Family Functioning Assessment-Investigation
Unit 5.1 Overview of the Family Functioning Assessment-Investigation 7.1.4 Pre-Service CPI Specialty Module 5.1.1

4 Learning Objectives 7.1.5 Pre-Service CPI Specialty Module 5.1.2

5 Domains of information Caregiver protective capacities
FFA-Investigations Domains of information Caregiver protective capacities Synthesizing of the information Safety analysis Safety determination Sufficient information Insufficient information 7.1.6 Pre-Service CPI Specialty Module 5.1.3

6 Activity: Did You See What I Saw?
Pre-Service CPI Specialty Module 5.1.4

7 Activity: Six Domain Case Scenarios
Pre-Service CPI Specialty Module 5.1.5

8 FSFN 7.1.8 Pre-Service CPI Specialty Module 5.1.6

9 Information Collection and Determining Impending Danger
Unit 5.2 Information Collection and Determining Impending Danger 7.2.9 Pre-Service CPI Specialty Module 5.2.1

10 Learning Objectives 7.2.10 Pre-Service CPI Specialty Module 5.2.2

11 Control existing threats Vulnerable to present or impending danger
Safe vs. Unsafe Control existing threats Vulnerable to present or impending danger 7.2.11 Pre-Service CPI Specialty Module 5.2.3

12 Activity: Safe/Unsafe
Pre-Service CPI Specialty Module 5.2.4

13 Impending Danger and Threshold Criteria
State of danger May not be currently active Anticipated Five threshold criteria 7.2.12 Pre-Service CPI Specialty Module 5.2.5

14 Presumptive vulnerability
Child Vulnerability Presumptive vulnerability 7.2.13 Pre-Service CPI Specialty Module 5.2.6

15 Impending Danger and the Six Domains of Information Collection
Impending danger safety threats and threshold criteria 7.2.14 Pre-Service CPI Specialty Module 5.2.7

16 Impending Danger Threats- Danger Threshold Criteria
Observable Out of Control Severe Imminent Vulnerable Child 7.2.15 Pre-Service CPI Specialty Module 5.2.8

17 Activity: Impending Danger Matching Game
Pre-Service CPI Specialty Module 5.2.9

18 Information Sufficiency, Verification and Reconciliation
Definition Application Evaluate impending danger Interviewing protocol 7.2.16 Pre-Service CPI Specialty Module

19 Activity: Determining Sufficiency Case Presentation
Pre-Service CPI Specialty Module

20 FFA-Investigations: Assessing the Family
Safe Unsafe Present and impending danger Safety threshold criteria 7.2.17 Pre-Service CPI Specialty Module

21 Activity: Assessing Danger Threats
Pre-Service CPI Specialty Module

22 Activity: Case Study Reviews
Pre-Service CPI Specialty Module

23 Unit 5.3 Assessing Impending Danger Related to Caregiver Protective Capacities (CPC) and Child Vulnerability 7.3.18 Pre-Service CPI Specialty Module 5.3.1

24 Learning Objectives 7.3.19 Pre-Service CPI Specialty Module 5.3.2

25 Caregiver Protective Capacities
Safety decision Interventions Case planning 7.3.20 Pre-Service CPI Specialty Module 5.3.3

26 CPC Categories Behavioral Cognitive Emotional 7.3.21
Pre-Service CPI Specialty Module 5.3.4

27 Caregiver Protective Capacities
Subtypes Scaling criteria Diminished caregiver capacities 7.3.22 Pre-Service CPI Specialty Module 5.3.5

28 Activity: CPC Determination
Pre-Service CPI Specialty Module 5.3.6

29 Activity: Determining Child Safety – Case Scenarios
Pre-Service CPI Specialty Module 5.3.7

30 In-Home Safety Analysis and Planning
Unit 5.4 In-Home Safety Analysis and Planning 7.4.24 Pre-Service CPI Specialty Module 5.4.1

31 Learning Objectives 7.4.25 Pre-Service CPI Specialty Module 5.4.2

32 Address the areas of need in the FFA Ensure child safety
Managing for Safety Address the areas of need in the FFA Ensure child safety Safety management action 7.4.26 Pre-Service CPI Specialty Module 5.4.3

33 Taking responsibility Family designated arrangements
Safety Plans In-Home Safety Plan Out of Home Safety Plan Taking responsibility Family designated arrangements Durable powers of attorney 7.4.27 Pre-Service CPI Specialty Module 5.4.4

34 Safety Planning Analysis
Analyze Engagement Teaming Actions Confirmation Consultation 7.4.28 Pre-Service CPI Specialty Module 5.4.5

35 Ongoing safety management Initiated in the CPI process
Conditions for Return Ongoing safety management Initiated in the CPI process 7.4.29 Pre-Service CPI Specialty Module 5.4.6

36 Activity: Safety Analysis and Planning
Pre-Service CPI Specialty Module 5.4.7

37 FSFN Documentation 7.4.30 Pre-Service CPI Specialty Module 5.4.8


Download ppt "The Family Functioning Assessment: Investigation and Safety Planning"

Similar presentations


Ads by Google