1 Niigataken Chuetsu-oki Earthquake and its Influences on the Kashiwazaki-Kariwa NPP

2 Summary of the Earthquake and Situation of the Kashiwazaki-Kariwa NPP
Occurrence: July 16, 2007 at 10:13 am JST Earthquake Source: 17km below the seabed off Jo-chuetsu area in Niigata prefecture (37°33.4′North、138°36.5′East) Epicenter Distance: 16km from the NPP Magnitude: 6.8 Situation of the NPP When the earthquake occurred: Unit 2 was in start-up Unit 3, 4 and 7 were in normal operation Unit 1, 5 and 6 were out of operation for the periodic inspections Units 2, 3, 4 and 7 were automatically shut down following the high seismic acceleration trip signals Kashiwazaki-Kariwa NPP Niigata city Epicenter

3 Rx. Coolant Temp. Rx. Water Level Unit 2 under Stat up
19:40 <100℃ Unit 3 100% Power 23:07 <100℃ Unit 4 100% Power 7/17 6:54 <100℃ Unit 7 100% Power 7/17 1:15 <100℃

4 Unit 1 RPV Inspection Schedule
August September October November December Phase 1 Phase 2 Phase 3 8/21 8/23 Visual inspection using under water TV camera

5 Unit 1 : Phase 1 Inspection
Flange Upper Grid Guide Rod Feed Water Sparger Core Shroud Core Spray Pipe Core Spray Sparger As a result of phase 1 inspection, the abnormality such as the damage / transformation / the falling off was not confirmed.

6 Unit 1 : Flange Guide Rod Flange

7 Unit 1 :Guide Rod Guide Rod FW Sparger Core Spray Pipe

8 Unit 1 :Feed Water Sparger

9 Unit 1 :Core Spray Pipe

10 Unit 1 :Core Spray Sparger
Core Shroud(upper ring) Core Spray Sparger

11 Unit 1 :Upper Grid LPRM

12 Unit 1 : RPV base bolts(A,As)

13 Unit 1 : Leakage of water into B5 floor
Break of Fire Extinguishing Pipe (B,C) B1 Floor B2 Floor B3 Floor B4 Floor B5 Floor Sump Duct Reactor Combination Building Pene Water Flow-in Leakage of water into B5 floor of the reactor combination building (Unit 1)

14 Unit 1 : Oil Tank (B,C) Land Subsidence

15 Unit 3 :Fire of House Transformer(1/3)
(B,C) As for the duct, cm dropped

16 Unit 3 :Fire of House Transformer(2/3)
Bedrock House Transformer Bus Duct 1 – 3 cm dropped 20 – 25 cm dropped

17 Unit 3 :Fire of House Transformer(3/3)
Unit 3 Main Transformer Unit 3 Main Generator House Transformer Start-up Transformer Emergency Bus Normal Bus Fire of House Trans. was not safety related problem

18 Unit 3 : DG(A,As) Upside Downside

19 Unit 3 : HCU (A,As)( Hydraulic Control System (CRD))

20 Unit 3 : MSIV (A,As)

21 Unit 3 : PLR Pump (A,As)

22 Unit 3 : RHR Pump (A,As)

23 Unit 3 : Blow-out Panel came off
(B,C)

24 Unit 3 : Displacement of the main exhaust duct
(B,C)

25 Unit 6 : Leakage of water including radioactive materials
(B,C) Leakage of water including radioactive materials into non-controlled area in the reactor building

26 Unit 6 : Leakage of water including radioactive materials
Leakage of water including radioactive materials into non-controlled area in the reactor building

27 Unit 6 : Damage of the reactor building overhead crane
Motor Damaged Damage found on the coupling of the drive axis of the reactor building overhead crane

28 Unit 7 : Detection of radioactive materials in the main exhaust duct
Duct Monitoring House Main Exhaust Duct Filter Reactor Building Turbine Building Reactor Conden-ser Rare Gas Hold -up Equipment Turbine Gland Steam Exhauster Building Ventilation Still Working after Plant Shutdown Detection of radioactive materials in the main exhaust duct resulting from loss of the steam seal inside the turbine

29 Other (B,C)

30 Solid waste storage warehouse