Presentation is loading. Please wait.

Presentation is loading. Please wait.

IEEE ESS Mesh Study Group

Similar presentations


Presentation on theme: "IEEE ESS Mesh Study Group"— Presentation transcript:

1 IEEE 802.11 ESS Mesh Study Group
Month 2002 doc.: IEEE /xxxr0 May 2004 IEEE ESS Mesh Study Group Garden Grove, California 11-13 May 2004 Donald E. Eastlake 3rd Donald Eastlake 3rd, Motorola Laboratories John Doe, His Company

2 Tuesday Evening 11 May 2004, Grand F+G, 7:30pm-9:30pm
Month 2002 doc.: IEEE /xxxr0 May 2004 Tuesday Evening 11 May 2004, Grand F+G, 7:30pm-9:30pm Call to Order Review IEEE 802 and Policies and Procedures Intellectual Property Voting All Registered Meeting Attendees May Vote All Main Motions require 75% Attendance Study Group Attendance List On-line Attendance reminder Donald Eastlake 3rd, Motorola Laboratories John Doe, His Company

3 IEEE-SA Standards Board Bylaws on Patents in Standards
Month 2002 doc.: IEEE /xxxr0 May 2004 IEEE-SA Standards Board Bylaws on Patents in Standards 6. Patents IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard. This assurance shall be provided without coercion and prior to approval of the standard (or reaffirmation when a patent becomes known after initial approval of the standard). This assurance shall be a letter that is in the form of either a) A general disclaimer to the effect that the patentee will not enforce any of its present or future patent(s) whose use would be required to implement the proposed IEEE standard against any person or entity using the patent(s) to comply with the standard or b) A statement that a license will be made available without compensation or under reasonable rates, with reasonable terms and conditions that are demonstrably free of any unfair discrimination This assurance shall apply, at a minimum, from the date of the standard's approval to the date of the standard's withdrawal and is irrevocable during that period. Approved by IEEE-SA Standards Board – December 2002 Donald Eastlake 3rd, Motorola Laboratories John Doe, His Company

4 Inappropriate Topics for IEEE SG Meetings
Month 2002 doc.: IEEE /xxxr0 May 2004 Inappropriate Topics for IEEE SG Meetings Don’t discuss licensing terms or conditions Don’t discuss product pricing, territorial restrictions or market share Don’t discuss ongoing litigation or threatened litigation Don’t be silent if inappropriate topics are discussed… do formally object. If you have questions, contact the IEEE Patent Committee Administrator at Approved by IEEE-SA Standards Board – December 2002 Donald Eastlake 3rd, Motorola Laboratories John Doe, His Company

5 Tuesday Evening (cont.) 11 May 2004, Grand F+G, 7:30pm-9:30pm
Month 2002 doc.: IEEE /xxxr0 May 2004 Tuesday Evening (cont.) 11 May 2004, Grand F+G, 7:30pm-9:30pm Officers & Minutes Approval of Minutes of Previous Meeting, 11-04/395r2 Approval of the Minutes of the Informal Teleconference held April 21st, 11-04/465r1 Note: Study Group Secretary: Tyan-Shu Jou, Janusys Networks Study Group Technical Editor: W. Steven Conner, Intel Task Group Secretary and Technical Editor will be chosen at first Task Group Meeting. “Free the APs” Button Graphics: 11-04/518r0. Approval of Agenda (a list of proposed presentations will be given so the group can order them) Donald Eastlake 3rd, Motorola Laboratories John Doe, His Company

6 Tuesday Evening (cont.) 11 May 2004, Grand F+G, 7:30pm-9:30pm
Month 2002 doc.: IEEE /xxxr0 May 2004 Tuesday Evening (cont.) 11 May 2004, Grand F+G, 7:30pm-9:30pm Report on the Status of the PAR and 5 Criteria Abbreviations were expanded at the request of a NesCom member. A NesCom member queried as to whether this overlapped any ITU or IEC standards effort. It appears that it does not. Usage Case Presentation: Presentation: “Defining Usage Models for ESS Mesh”, Steven Conner, Intel Corp, 11-04/528r1 Recess for 10 mintues for i cake Vote of thanks to i passed unanmiously. Presentation: “A rationale for security (mis)use cases”, Jasmeet Chhabra, Intel Corp /586 Adjourn until Wednesday at 8am Donald Eastlake 3rd, Motorola Laboratories John Doe, His Company

7 Wednesday Morning 12 May 2004, Grand F+G, 8am-10am
Month 2002 doc.: IEEE /xxxr0 May 2004 Wednesday Morning 12 May 2004, Grand F+G, 8am-10am On-line attendance reminder Usage Case Presentations: Presentation: “Usage Models for ESS Mesh”, Kevin Dick, Kue Wong, Nortel Networks, 04/568r0 Presentation: “ESS Mesh Deployment Usage Model”, Ted Kuo, Tyan-Shu Jou, Ming Sheu, Janusys Networks, 04/590 Presentation: “Usage scenario for ESS mesh network”, Hidenori Aoki, Koji Omae and Yoichi Matsumoto, NTT DoCoMo, 04/600 Presentation: “Mesh networks for home entertainment”, Guido R. Hiertz, Yunpeng Zang, ComNets; Jörg Habetha, Philips Research, 04/530 Architecture and Definitions Presentation: Presentation: “Suggested Clarification of s ESS Mesh Terminology”, Steven Conner, Intel Corp, 04/529r1 Recess until 1:30pm Donald Eastlake 3rd, Motorola Laboratories John Doe, His Company

8 Wednesday Afternoon 12 May 2004, Grand F+G, 1:30pm-3:30pm
Month 2002 doc.: IEEE /xxxr0 May 2004 Wednesday Afternoon 12 May 2004, Grand F+G, 1:30pm-3:30pm On-line attendance reminder Architecture and Definitions Presentations: Presentation: “ESS-Mesh: Things That Make Me Go Hmm” Thomas Maufer, Nvidia, 04/602r4 Presentation: “Need Clarification on The Definition of ESS Mesh”, Tricci So, Radiant Zone, 04/500r1 Presentation: “Consideration on WDS Addressing”, Tricci So, Radiant Zone, 4/501r1 Presentation: “Is the MAC sufficient for wireless high speed mesh LANs?”, Guido R. Hiertz, Lothar Stibor, ComNets; Jörg Habetha, Philips Research, 04/558r2 Recess until 4pm Donald Eastlake 3rd, Motorola Laboratories John Doe, His Company

9 Wednesday Afternoon (cont.) 12 May 2004, Grand F+G, 4:00pm-6:00pm
Month 2002 doc.: IEEE /xxxr0 May 2004 Wednesday Afternoon (cont.) 12 May 2004, Grand F+G, 4:00pm-6:00pm On-line attendance reminder Other Presentation: “Mesh in CAPWAP and AP Functional Definitions”, Lily L. Yang, Intel; Tyan-Shu Jou, Janusys Networks, 04/595r3 Study/Task Group Process, Take 1: How should we proceed toward a draft? Discussions of process, possible informal subgroups, schedule Adjourn until 8am Thursday Ad hoc meetings of informal Definitions and Usage Case subgroups during remainder of time slot Donald Eastlake 3rd, Motorola Laboratories John Doe, His Company

10 Thursday Morning 13 May 2004, Grand D, 8am-10am
Month 2002 doc.: IEEE /xxxr0 May 2004 Thursday Morning 13 May 2004, Grand D, 8am-10am On-line attendance reminder Other Presentations: Presentation: “Performance Implications of the MAC on Multi-Hop Mesh Networks”, Xingang Guo, W. Steven Conner, Lily Yang, Intel Corp., 04/577r1 Presentation: “Is Spanning Tree Protocol Right for ESS Mesh”, Tyan-Shu Jou, Ted Kuo, Ming Sheu, Janusys Networks, 04/598r0 Presentation: “On ESS Mesh Device Discovery”, Tyan-Shu Jou, Ted Kuo, and Ming Sheu, Janusys Networks, 04/599r0 Recess until 10:30am Donald Eastlake 3rd, Motorola Laboratories John Doe, His Company

11 Thursday Morning 13 May 2004, Grand D,10:30am-12:30pm
Month 2002 doc.: IEEE /xxxr0 May 2004 Thursday Morning 13 May 2004, Grand D,10:30am-12:30pm On-line attendance reminder Study/Task Group Process, Take 2: Discussion of typical process of getting to Letter Ballot. Some present expressed interest in working together informally as subgroups on several topics as follows: Usage Cases, Definitions, Routing, Security, and Quality of Service. There was strong interest in having a joint meeting in July with r and other groups such as CAPWAP, 802.1, or WNM. The following possibilities for the July meeting were straw voted as follows: Adoption of an Initial Definitions document, adopted 33-0 Usage Cases and Functional Requirements discussion, adopted 38-0 Architecture Presentations, adopted 31-0 Other ad-hoc subgroup results and Presentations, adopted 16-1 Issuing a Call for Proposals, defeated 9-19 Donald Eastlake 3rd, Motorola Laboratories John Doe, His Company

12 Thursday Morning (cont.) 13 May 2004, Grand D,10:30am-12:30pm
Month 2002 doc.: IEEE /xxxr0 May 2004 Thursday Morning (cont.) 13 May 2004, Grand D,10:30am-12:30pm Decided on have a teleconference on the agenda for July meeting. Teleconference to be held Wednesday, 30 June, at 3pm Pacific Daylight time for discussion of the July agenda. Adjourn sine die ad hoc subgroup meetings for remainder of time slot Donald Eastlake 3rd, Motorola Laboratories John Doe, His Company

13 Thursday Afternoon 13 May 2004, Grand D,1:30pm-3:30pm
Month 2002 doc.: IEEE /xxxr0 May 2004 Thursday Afternoon 13 May 2004, Grand D,1:30pm-3:30pm Ad hoc meetings of subgroups Donald Eastlake 3rd, Motorola Laboratories John Doe, His Company

14 [Reference Information]
May 2004 [Reference Information] PAR & 5 Criteria 04/54r2, Draft PAR for IEEE ESS Mesh 04/56r1, Five Criteria for IEEE ESS Mesh Study Group Meeting Minutes March 2004, Lake Buena Vista, Florida, 04/395r2 January 2004, Vancouver, British Columbia, 04/110r2 Teleconference Minutes April 21st, 11-04/465r1 Earlier Mesh Submissions to WNG Study Group, see r0 Donald Eastlake 3rd, Motorola Laboratories


Download ppt "IEEE ESS Mesh Study Group"

Similar presentations


Ads by Google