Presentation is loading. Please wait.

Presentation is loading. Please wait.

MONIPULO OIL & GAS ROUNDTABLE

Similar presentations


Presentation on theme: "MONIPULO OIL & GAS ROUNDTABLE"— Presentation transcript:

1 MONIPULO OIL & GAS ROUNDTABLE
VIRTUAL GAS PIPELINES – A REALITY : CASE-STUDY OF TOTALSUPPORT’S CNG INFRASTRUCTURE PROJECT IN PORTHARCOURT BY UBANI NKAGINIEME – Ph.D TOTALSUPPORT ENERGY GROUP .

2 HISTORICAL BACKGROUND
Nigeria has abundant natural gas resources. However the pipeline infrastructure to evacuate produced(associated & non-associated) gases is very limited to small clusters in Lagos, Portharcourt, Aba, Ota, Agbara, Ajaokuta, Ikot-Abasi, Benin. A few other clusters like Calabar is in the works.

3 HISTORICAL BACKGROUND
Natural gas fuels are inherently cheaper and much cleaner than other existing fossil-fuel sources like diesel, gasoline, fuel-oil. In view of the above, a national and holistic shift to cheaper and cleaner natural gas fuels makes economic and environmental sense.

4 HISTORICAL BACKGROUND
Forward thinking companies like Dufil Prima Foods Plc(Indomie), IMI, and Schlumberger are already switching to natural gas fuels

5 HISTORICAL BACKGROUND
Being a Clean Energy Company, we are pioneering this Private Industry effort in Nigeria, especially in the Niger-Delta We have just delivered the First Truly Nigerian CNG Infrastructure in spite of unimaginable challenges.

6 PROJECT DESCRIPTION Gas Receiving This project receives pipeline gas from the Shell gas node at Eleme Junction Portharcourt. The received gas is passed through a Customer Station(CS) to be filtered and prepared for compression.

7

8 PROJECT DESCRIPTION Gas Compression The pipeline gas received at a pressure of up to 70bars is further compressed to 250bars and loaded into gas transport modules(GTM).

9 CUSTOM ATLAS-COPCO COMPRESSORS AT MOTHER STATION

10 PROJECT DESCRIPTION Gas Transport The gas transport modules then moves the compressed gas to DUFIL premises at Choba – Pht(~30 Klm) … where there is no pipeline infrastructure.

11 GTM TRUCKS AT DUFIL DAUGHTER STATION

12 INSIDE A GTM TANK

13 PROJECT DESCRIPTION Gas Consumption At DUFIL-Choba, the compressed gas in the GTM is consumed after reducing the pressure to the required consumption pressure(3Bar) --- hence the need to have PRMS(Pressure reducing & metering station) at DUFIL. The gas is then fed to Dufil gas generators and Steam Boilers

14 DAUTHER STATION AT DUFIL CHOBA

15 JENBACHER GAS GENS

16 DUFIL-CHOBA BOILERS

17 PROJECT DESCRIPTION PROMOTER : TOTALSUPPORT LTD PRIMARY GAS SUPPLIER :
PRIMARY GAS SUPPLIER : SHELL NIGERIA GAS PRIMARY OFF-TAKER : DUFIL PRIMA FOODS PLC --- INDOMIE – SECONDARY OFFTAKERS : SCHLUMBERGER; NDDC; UNIVERSITY OF PORTHARCOURT; IMI-LTD; GREATER-PH;

18 PROJECT DESCRIPTION Operational Experience in Niger Delta Totalsupport Group is essentially a child of the Niger-Delta. We are headquartered in Portharcourt. Since starting operations with Schlumberger in 1990, Niger-Delta has remained our primary area of operation and focus.

19 THANK YOU QUESTIONS PLS

20

21 APPROACH ZERO-FLARE BELOW 5 SLIDES ARE PICTURES OF WHAT WE MUST NOT ENCOURAGE BY DOING NOTHING

22 APPROACH ZERO-FLARE Nigeria currently ranks #2 in the global list of “Worst-Emissions-Footprint” …. Only Siberia-Russia is worse.

23 NIGERIA EMISSIONS PROFILE : 2009-2012

24 CDM = CLEAN DEVELOPMENT MECHANISM CNG = COMPRESSED NATURAL GAS
RUSSIAN EMISSIONS PROFILE : CDM = CLEAN DEVELOPMENT MECHANISM CNG = COMPRESSED NATURAL GAS LNG = LIQUIFIED NATURAL GAS GTM = GAS TRANSPORT MODULE AGG = ASSOCIATED GAS GATHERING F = Red F = Green F = Blue Vectors drawn on gas flares. 3 of 4

25 AHIA FLOWSTATION(UMUDIOGA) - NPDC

26 EBOCHA FLOWSTATION - AGIP

27 WHAT WE WASTE !! Nigeria flares about 2.1Billion scf of gas daily. This is equivalent to wasting over 6,500MW of electricity or fueling over 1,000,000 commercial vehicles daily. At Flow-Station pricing … this represents an annual wastage of over $1.5Billion.

28 Some Nox Emissions Effects In Niger-Delta
Acid rain leading to degraded & disappearing farm/fishery/livestock yields Polluted & noxious air leading to dramatic increase in cases of asthma, cancer, skin & respiratory diseases

29 A BETTER OUTCOME IS POSSIBLE

30 It Must Be Clean The Capstone MicroTurbine approaches the performance of zero-emissions technologies, but at a fraction of the cost... KYOTO COMPLIANCE BRAND NEW DIESEL ENGINE UTILITY TURBINE & SELECT GAS ENGINES LOW-NOX TURBINE CAPSTONE TURBINE FUEL CELLS PHOTO-VOLTAIC WIND TURBINE Source: EPA Report AP-42: Compilation of Air Pollutant Emission Factors

31 A BETTER OUTCOME IS POSSIBLE

32 18-25MW MOBILE POWER

33 SMALL LNG PLANT

34 ON-SHORE FIELD : IMPLEMENTATION ARCHITECTURE
LPG/PROPANE STREAM POWER TO COMMUNITY & GRID GAS PROCESS PLANT CNG & LNG LEAN GAS WET GAS STREAM EXPORT CRUDE STREAM FLOW STATION CRUDE STREAM FUEL-OIL STREAM FOR RE-INJECTION TO EXPORT CRUDE LINE MODULAR REFINERY PRODUCTS STREAM : PMS/KERO/DIESEL/FUEL-OIL

35


Download ppt "MONIPULO OIL & GAS ROUNDTABLE"

Similar presentations


Ads by Google