Presentation is loading. Please wait.

Presentation is loading. Please wait.

Report of TGm – July 2005 DATE: July 2005 Author(s) January 2005

Similar presentations


Presentation on theme: "Report of TGm – July 2005 DATE: July 2005 Author(s) January 2005"— Presentation transcript:

1 Report of TGm – July 2005 DATE: July 2005 Author(s) January 2005
doc.: IEEE /1647 July 2005 Report of TGm – July 2005 DATE: July 2005 Author(s) Name Company Address Phone Bob O’Hara Cisco Systems 3625 Cisco Way, San Jose, CA 95134 Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures < ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at < Bob O'Hara, Cisco Systems Bob O'Hara, Airespace

2 Abstract Report of the meeting of TGm at the July 2005 session.
January 2005 doc.: IEEE /1647 July 2005 Abstract Report of the meeting of TGm at the July 2005 session. Bob O'Hara, Cisco Systems Bob O'Hara, Airespace

3 Goals for July 2005 July 2005 Process technical comments received during WG ballot Issue of draft to working group letter ballot Request conditional approval of the 802 Executive Committee to send REV-ma to Sponsor Ballot Bob O'Hara, Cisco Systems

4 Submissions Submissions 05/710, “WDS” Clarifications, Darwin Engwer
July 2005 Submissions 05/710, “WDS” Clarifications, Darwin Engwer 05/777, Some LB75 letter ballot resolutions, Johnny Zweig Bob O'Hara, Cisco Systems

5 Proposed Agenda Consent agenda: Review IEEE Patent Policy
July 2005 Consent agenda: Approve minutes and report from May and June 2005 meetings Review IEEE Patent Policy Review interpretation request procedure New business Submissions Process technical comments from letter ballot Issue new draft for recirculation ballot Place new draft for sale by IEEE Adjourn Bob O'Hara, Cisco Systems

6 Motion #1 to adopt Agenda
July 2005 Moved: to adopt the agenda Mover: Bill Brasier, Anil Sanwalka Passes: unanimous Bob O'Hara, Cisco Systems

7 IEEE-SA Standards Board Bylaws on Patents in Standards
July 2005 IEEE-SA Standards Board Bylaws on Patents in Standards Bob O'Hara, Cisco Systems

8 Interpretation Procedure
July 2005 Send to Linda Gargiulo IEEE forwards requests to the WG WG responds Bob O'Hara, Cisco Systems

9 Motion #2 Moved: To accept all comment resolutions.
July 2005 Moved: To accept all comment resolutions. Moved: Mike Montemurro, Mike Moreton Passes: Unanimous Bob O'Hara, Cisco Systems

10 Motion #3 July 2005 Moved: to instruct the editor to create REV-ma D3.0 by incorporation of all comment resolutions. Moved: Darwin Engwer, Mike Montemurro Passes: unanimous Bob O'Hara, Cisco Systems

11 Motion #4 July 2005 Moved: To send REV-ma D3.0 to working group recirculation ballot. Moved: Stephen McCann,Anil Sanwalka Passes: unanimous Bob O'Hara, Cisco Systems

12 Motion #5 July 2005 Moved: To instruct the chair of the working group to make REV-ma D3.0 available for sale. Moved: Anil Sanwalka, Mike Moreton Passes: unanimous Bob O'Hara, Cisco Systems

13 Motion #6 July 2005 Moved: to authorize Task Group m to hold ballot resolution meetings upon closure of the recirculation ballot on REV-ma D3.0 and issue a new draft (802.11REV-ma D4.0) upon resolution of all comments. Moved: Mike Montemurro, Stephen McCann Passes: unanimous Bob O'Hara, Cisco Systems

14 Motion #7 July 2005 Moved: To authorize sending REV-ma D4.0 to working group recirculation ballot, if necessary, upon its completion by the editor. Moved: Anil Sanwalka, Mike Montemurro Passes: unanimous Bob O'Hara, Cisco Systems

15 Motion #8 July 2005 Moved: To authorize Task Group m to hold ballot resolution meetings, if necessary, upon the close of the recirculation ballot on REV-ma D4.0. Moved: Mike Moreton, Mike Montemurro Passes: unanimous Bob O'Hara, Cisco Systems

16 Motion #9 July 2005 Moved: To request conditional approval to send REV-ma to sponsor ballot upon conclusion of a working group recirculation ballot that meets all requirements in the LMSC Policies and Procedures. Moved: Darwin Engwer, Anil Sanwalka Passes: unanimous Bob O'Hara, Cisco Systems

17 Motion #10 July 2005 Moved: To authorize the working group chair to send REV-ma to sponsor ballot, upon successful completion of a working group recirculation ballot that meets all requirements for conditional approval as set forth in the LMSC Policies and Procedures. Moved: Stephen McCann, Mike Montemurro Passes: unanimous Bob O'Hara, Cisco Systems

18 Work completed Lots of comments processed July 2005
Bob O'Hara, Cisco Systems

19 Summary Technical Comments at Start 135 Technical Resolutions Adopted
July 2005 Technical Comments at Start 135 Technical Resolutions Adopted Technical Comments Remaining Percentage completion 100% Bob O'Hara, Cisco Systems

20 Output Documents 05/0709r0: Report of comments and resolutions
July 2005 05/0709r0: Report of comments and resolutions 05/0708r0: This report 802.11REVma-d3.0: to be available soon Bob O'Hara, Cisco Systems

21 Goals for September July 2005 Depends on the outcome of the recirculation ballot(s) Process any interpretation requests received Bob O'Hara, Cisco Systems

22 Adjourn Meeting adjourned at 5:30pm on May 19, 2005 July 2005
Bob O'Hara, Cisco Systems

23 Attendees Bill Brasier Darwin Engwer Anil Sanwalka Tom Tsouligiannis
July 2005 Bill Brasier Darwin Engwer Anil Sanwalka Tom Tsouligiannis John Rosdahl Donald Eastlake Mike Montemurro Mike Moreton Stephen McCann Johnny Zweig Bob O'Hara, Cisco Systems


Download ppt "Report of TGm – July 2005 DATE: July 2005 Author(s) January 2005"

Similar presentations


Ads by Google