A NEW APPROACH. A NEW APPROACH WHAT CAUSED THE MAINE DOT TO CONSIDER CBE? LACK OF COMPETITION VOLITILE MATERIAL COST LACK OF FUNDING CONTRACTOR TAKING.

Similar presentations


Presentation on theme: "A NEW APPROACH. A NEW APPROACH WHAT CAUSED THE MAINE DOT TO CONSIDER CBE? LACK OF COMPETITION VOLITILE MATERIAL COST LACK OF FUNDING CONTRACTOR TAKING."— Presentation transcript:

1

2 A NEW APPROACH

3 WHAT CAUSED THE MAINE DOT
TO CONSIDER CBE? LACK OF COMPETITION VOLITILE MATERIAL COST LACK OF FUNDING CONTRACTOR TAKING ADVANTAGE OF LUMP SUM ITEMS AND ERRORS IN PLANS INCREASE IN NUMBER AND COST OF CONTRACT MODIFICATIONS

4

5

6 WHY SHOULD MAINE DOT USE CBE

7 Reviewing the plans for constructibility will create better plans and will result in better prices.
Increase Credibility of the Department Review and Verify bid Quantities and Specifications Market Analysis Material Cost Analysis Review Contract Documents from Consultant Design Firms Assist in the defense of claims Ability to question contractors bidding practices Train MDOT designers and construction personnel Assist Residents in validating contract modifications

8 EXAMPLES OF MAINE DOT COST BASED ESTIMATING

9 Eliminate Existing 600 mm CMP

10

11 Cost Estimate Report The additional estimated cost of using PGAB in lieu of the traditional PGAB for a MDOT project located in Jackman and Long Pond TWP, Maine. February 2006

12 AN EXAMPLE OF A SUBTLE UNBALANCE BID;
A $10 MARK-UP COST $30,000 THE 3,000 HRS OVER-RUNS 37% TO 4,167 HRS THE $30,000 INVESTMENT RESULT IN A $41,670 RETURN

13

14

15

16 206.061 Structural Exc-Below Grade;
5,850 $8/cy = $46,800

17