Presentation is loading. Please wait.

Presentation is loading. Please wait.

0564R -- Review of Annual Read Meter Reading requirements

Similar presentations


Presentation on theme: "0564R -- Review of Annual Read Meter Reading requirements"— Presentation transcript:

1 0564R -- Review of Annual Read Meter Reading requirements
Plan to address failure to obtain meter reading at Annual Read Supply Points Andy Clasper National Grid Distribution

2 0564R ..’must read’ site visit trial
A National Grid plan to extend the current ‘must read’ process covering Annual Read Meters was articulated at Distribution Workgroup on 28th Jan 16 Currently circa 26,000 Supply Meters remain unread for between 3 and 4 years A further 26,000 Supply Meters remain unread for more than 4 years In response to concerns received National Grid will carry out a ‘must read’ trial of 100 properties which have not received a valid meter read for 3 to 4 years Will test the assertion that this population will prove difficult to procure reads The trial sample was collated at random Trial costs will be borne by National Grid G4S are in possession of the 100 sites to be visited and are awaiting our signal to proceed G4S will carry out the visits as per current ‘must read’ process – up to 3 visits Visits expected to take place during March/April Notification to Shippers of the properties to be visited will not be provided Warrants will not be sought where no access is identified An update will be provided to Distribution Workgroup on next steps once the trial results are collated


Download ppt "0564R -- Review of Annual Read Meter Reading requirements"

Similar presentations


Ads by Google