Presentation is loading. Please wait.

Presentation is loading. Please wait.

Case study- 1 Developing Process of Safety Regulations

Similar presentations


Presentation on theme: "Case study- 1 Developing Process of Safety Regulations"— Presentation transcript:

1 Case study- 1 Developing Process of Safety Regulations
Workshop on regulatory control, 6-10 November 2017, Rabat  Case study- 1 Developing Process of Safety Regulations Group 1

2 Countries presented in the group
Ghana Iran Jordan Kenya Morocco Nigeria Tunisia

3 Developing Process of Safety Regulations
Essential needs/Inputs/ supporting elements Major steps of the development process Timeline for the activities IAEA standards Experts (technical and legal) National legislation National guidelines and technical documentations International regulation Stackeholders Legal officers Determining the needs Between 6 months to 1 year Setting the priority 1-3 month Determining the scope Determining the resources 6 months – 1 year Colleting the information Adapt and adopt Initial drafting 3 – 6 months Review 1- 2 years Evaluation of comments 2- 3 months Establishment of regulation 1 – 3 months

4 Thanks


Download ppt "Case study- 1 Developing Process of Safety Regulations"

Similar presentations


Ads by Google