1 NMA and E-array Progress
EVLA Phase II NMA and E-array Progress Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

2 EVLA Advisory Committee Meeting
People Aaron Cohen Steve Durand Leonia Kogan Bob Tacker Cam Wade Craig Walker Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

3 EVLA Advisory Committee Meeting
NMA Puzzle Combine UV Coverage, Land Availability, Power Availability and Fiber Optics Network into a practical Array Design Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

4 EVLA Advisory Committee Meeting
Criteria for now Fiber --- Find Sites Near Existing, Available Fibers. Power --- Find Sites with minimum distance from 3-phase power. Land --- Find sites with multiple acceptable land options. Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

5 EVLA Advisory Committee Meeting
Criteria for now Stay away from sensitive environmental areas, population concentrations, potential interference, etc In some cases add, somewhat longer runs of fiber or power to fill out uv coverage. Current array is likely to be modified later. Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

6 EVLA Advisory Committee Meeting
NMA Sites Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

7 EVLA Advisory Committee Meeting
NMA - Milagro Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

8 EVLA Advisory Committee Meeting
NMA - Separ Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

9 EVLA Advisory Committee Meeting
Fidelity “100km” Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

10 Fidelity Full Resolution
Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

11 EVLA Advisory Committee Meeting
NMA Sites Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

12 EVLA Advisory Committee Meeting
NMA Issues What is An Acceptable Configuration ? What should happen in 2003 ? Should we continue full speed ahead (at some expense to phase I) or should we “mothball” NMA until we get real funding ? Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

13 EVLA Advisory Committee Meeting
E-array Goal: Better Fidelity and Surface Brightness Sensitivity at minimum Cost. Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

14 EVLA Advisory Committee Meeting
E UV-coverage Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

15 EVLA Advisory Committee Meeting
E-array However, E array beam-shape, shadowing become a problem in the south (e.g. –30d) To image well in the south we need a stretched E-array. Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

16 EVLA Advisory Committee Meeting
Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

17 EVLA Advisory Committee Meeting
Shadowing Regular E Array E-30 Array Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

18 EVLA Advisory Committee Meeting
E-30 UV-coverage Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

19 EVLA Advisory Committee Meeting
Simulations Plan for the phase II completion document is for full mosaic simulations (including GBT) to test E and E-30 performance using AIPS++. Frazer Owen EVLA Advisory Committee Meeting June 11, 2002

20 EVLA Advisory Committee Meeting
E-array Issues How much simulation for E should we do ? Do we want E-30 ? Frazer Owen EVLA Advisory Committee Meeting June 11, 2002