Presentation is loading. Please wait.

Presentation is loading. Please wait.

July 2009 Mesh Meeting Agenda

Similar presentations


Presentation on theme: "July 2009 Mesh Meeting Agenda"— Presentation transcript:

1 July 2009 Mesh Meeting Agenda
doc.: IEEE P /661r4 July 2009 July 2009 Mesh Meeting Agenda Date: Authors: Name Address Affiliation Phone Donald Eastlake 3rd 155 Beaver Street, Milford, MA USA Stellar Switches Donald Eastlake 3rd, Sterllar Switches Donald Eastlake 3rd, Stellar Switches

2 IEEE 802.11s: Mesh Networking Task Group
July 2009 doc.: IEEE P /661r4 July 2009 IEEE s: Mesh Networking Task Group TGs Motto: Perfection is achieved not when there is nothing left to add but when there is nothing left to take away. San Francisco, California 13-16 July, 2009 Chair: Donald E. Eastlake 3rd (Stellar Switches) Temporary Technical Editor: Kazuyuki Sakoda (Sony) Secretary: Stephen Rayment (BelAir Networks) Donald Eastlake 3rd, Sterllar Switches Donald Eastlake 3rd, Stellar Switches

3 doc.: IEEE P802.11-09/661r4 Hyatt Regency, San Francisco, California
July 2009 doc.: IEEE P /661r4 July 2009 Venue Hyatt Regency, San Francisco, California Donald Eastlake 3rd, Sterllar Switches Donald Eastlake 3rd, Stellar Switches

4 General Flow of the TGs Meeting
July 2009 General Flow of the TGs Meeting Monday (ad hoc) Administrivia Resolution of Comments and Improvement of the Draft Tuesday Administrivia and Status TGs Process Presentation Wednesday Security Presentations Thursday TGs Process Discussion Teleconferences/Ad-Hoc Meetings Discussion and Votes Donald Eastlake 3rd, Sterllar Switches

5 Monday, 13 July 2009 08:00–11:00 (Pacific Concourse A)
doc.: IEEE P /661r4 July 2009 Monday, 13 July :00–11:00 (Pacific Concourse A) Call ad hoc meeting to Order Miscellaneous Announcements Manual attendance reminder Review of IEEE 802 and Policies and Procedures on Intellectual Property, Inappropriate Topics, Etc. Approval of Ad Hoc Meeting Agenda Status of TGs Draft 3.02 and Comment Resolutions “Resolution of comments from Letter Ballot 147”, 11-09/471r10 Comment Resolution and improvement of the Draft Adjourn ad hoc meeting. Donald Eastlake 3rd, Sterllar Switches Donald Eastlake 3rd, Stellar Switches

6 Automated Attendance Recording
July 2009 doc.: IEEE P /661r4 July 2009 Automated Attendance Recording Go to (Documents: or or just Sign-in Claim attendance credit for each session. Only “sign-in” and “claim credit” for yourself, do NOT “sign-in” for others. You have to log in every session! Donald Eastlake 3rd, Sterllar Switches Donald Eastlake 3rd, Stellar Switches

7 Miscellaneous Announcements
July 2009 Miscellaneous Announcements Warning: Do not leave your laptops unattended! The meeting is not responsible for your unwatched stuff. Wear your badge at all times in the meeting area! Individual membership In all IEEE standards meetings, membership is by individual, hence you do not represent a company or organization. Photographs and Recordings No sound recordings are permitted at WG or TG meetings. No photographs allowed without WG Chair permission. Media – Press and Analyst briefings Only the /.15/.18/.19/.22 WG Chair and WG Vice-Chairs are allowed to give verbal statements/interviews to the media on behalf of their respective IEEE working group. Donald Eastlake 3rd, Sterllar Switches

8 July 2009 Important Stuff Note the links from the items in red in the left column of all pages of the Working Group meeting agenda. Affiliation Frequently Asked Questions: Anti-Trust: IEEE Ethics: Letter of Assurance Form: IEEE Patent Committee: IEEE Patent Policy: Patent FAQ: Donald Eastlake 3rd, Sterllar Switches

9 Participants, Patents, and Duty to Inform
July 2009 doc.: IEEE P /661r4 July 2009 Participants, Patents, and Duty to Inform All participants in this meeting have certain obligations under the IEEE-SA Patent Policy. Participants: “Shall inform the IEEE (or cause the IEEE to be informed)” of the identity of each “holder of any potential Essential Patent Claims of which they are personally aware” if the claims are owned or controlled by the participant or the entity the participant is from, employed by, or otherwise represents “Personal awareness” means that the participant “is personally aware that the holder may have a potential Essential Patent Claim,” even if the participant is not personally aware of the specific patents or patent claims “Should inform the IEEE (or cause the IEEE to be informed)” of the identity of “any other holders of such potential Essential Patent Claims” (that is, third parties that are not affiliated with the participant, with the participant’s employer, or with anyone else that the participant is from or otherwise represents) The above does not apply if the patent claim is already the subject of an Accepted Letter of Assurance that applies to the proposed standard(s) under consideration by this group Quoted text excerpted from IEEE-SA Standards Board Bylaws subclause 6.2 Early identification of holders of potential Essential Patent Claims is strongly encouraged No duty to perform a patent search Donald Eastlake 3rd, Sterllar Switches Donald Eastlake 3rd, Stellar Switches

10 Patent Related Links July 2009 All participants should be familiar with their obligations under the IEEE-SA Policies & Procedures for standards development. Patent Policy is stated in these sources: IEEE-SA Standards Boards Bylaws IEEE-SA Standards Board Operations Manual Material about the patent policy is available at If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at or visit This slide set is available at Donald Eastlake 3rd, Sterllar Switches

11 Call for Potentially Essential Patents
July 2009 doc.: IEEE P /661r4 July 2009 Call for Potentially Essential Patents If anyone in this meeting is personally aware of the holder of any patent claims that are potentially essential to implementation of the proposed standard(s) under consideration by this group and that are not already the subject of an Accepted Letter of Assurance: Either speak up now or Provide the chair of this group with the identity of the holder(s) of any and all such claims as soon as possible or Cause an LOA to be submitted Donald Eastlake 3rd, Sterllar Switches Donald Eastlake 3rd, Stellar Switches

12 Other Guidelines for IEEE WG Meetings
July 2009 doc.: IEEE P /661r4 July 2009 Other Guidelines for IEEE WG Meetings All IEEE-SA standards meetings shall be conducted in compliance with all applicable laws, including antitrust and competition laws. Don’t discuss the interpretation, validity, or essentiality of patents/patent claims. Don’t discuss specific license rates, terms, or conditions. Relative costs, including licensing costs of essential patent claims, of different technical approaches may be discussed in standards development meetings. Technical considerations remain primary focus Don’t discuss or engage in the fixing of product prices, allocation of customers, or division of sales markets. Don’t discuss the status or substance of ongoing or threatened litigation. Don’t be silent if inappropriate topics are discussed … do formally object. See IEEE-SA Standards Board Operations Manual, clause and “Promoting Competition and Innovation: What You Need to Know about the IEEE Standards Association's Antitrust and Competition Policy” for more details. Donald Eastlake 3rd, Sterllar Switches Donald Eastlake 3rd, Stellar Switches

13 Tuesday, 14 July 2009 08:00 – 10:00 (Pacific Concourse M)
doc.: IEEE P /661r4 July 2009 Tuesday, 14 July :00 – 10:00 (Pacific Concourse M) Call Meeting to Order Selection of Temporary Secretary Miscellaneous Announcements Automated attendance reminder Review of IEEE 802 and Policies and Procedures on Intellectual Property, Inappropriate Topics, Etc. Approval of Meeting Agenda Approval of Minutes: Montreal meeting minutes: 11-09/595r0 Donald Eastlake 3rd, Sterllar Switches Donald Eastlake 3rd, Stellar Switches

14 Tuesday, 14 July 2009 08:00 – 10:00 (Pacific Concourse M)
doc.: IEEE P /661r4 July 2009 Tuesday, 14 July :00 – 10:00 (Pacific Concourse M) Approval of Minutes (continued) Teleconference minutes: May 27, 11-09/665r0 June 24, 11-09/701r0 July 8, 11-09/737r0 Monday morning ad hoc minutes: 11-09/TBDr0 Status of TGs Draft 3.02 and Comment Resolutions “Resolution of comments from Letter Ballot 147”, 11-09/471r10 Donald Eastlake 3rd, Sterllar Switches Donald Eastlake 3rd, Stellar Switches

15 Tuesday, 14 July 2009 08:00 – 10:00 (Pacific Concourse M)
doc.: IEEE P /661r4 July 2009 Tuesday, 14 July :00 – 10:00 (Pacific Concourse M) Comment Resolution and improvement of the Draft Moved, to reopen CIDs 409, 415, 424, 585, 783, 1172, and 773 because more more detailed editing instructions are needed. Mover: Seconder: Yes: No: Abstain: Recess until 13:30 Donald Eastlake 3rd, Sterllar Switches Donald Eastlake 3rd, Stellar Switches

16 Pending Presentations
July 2009 Pending Presentations 11-09/0562r2, MCF Issues - Liwen Chu (STMicroelectronics) 11-09/754r0, Resolving SAE Comments - Dan Harkins (Aruba) Donald Eastlake 3rd, Sterllar Switches

17 Tuesday, 14 July 2009 13:30 – 15:30 (Pacific Concourse M)
doc.: IEEE P /661r4 July 2009 Tuesday, 14 July :30 – 15:30 (Pacific Concourse M) Call Meeting to Order IPR and Attendance Recording Reminder Comment Resolution and improvement of the Draft Recess until 19:30 Donald Eastlake 3rd, Sterllar Switches Donald Eastlake 3rd, Stellar Switches

18 Tuesday, 14 July 2009 19:30 – 21:30 (Pacific Concourse M)
doc.: IEEE P /661r4 July 2009 Tuesday, 14 July :30 – 21:30 (Pacific Concourse M) Call Meeting to Order IPR and Attendance Recording Reminder Comment Resolution and improvement of the Draft Recess until 13:30 Wednesday Donald Eastlake 3rd, Sterllar Switches Donald Eastlake 3rd, Stellar Switches

19 Wednesday, 15 July 2009 13:30 – 15:30 (Pacific Concourse H)
doc.: IEEE P /661r4 July 2009 Wednesday, 15 July :30 – 15:30 (Pacific Concourse H) Call Meeting to Order IPR and Attendance Recording Reminder Security Presentations TGs Authenticated Encryption Function, John Petro (Envieta), 11-09/770r0 Comment Resolution and improvement of the Draft Recess until 16:00 Donald Eastlake 3rd, Sterllar Switches Donald Eastlake 3rd, Stellar Switches

20 Wednesday, 15 July 2009 16:00 – 18:00 (Pacific Concourse H)
doc.: IEEE P /661r4 July 2009 Wednesday, 15 July :00 – 18:00 (Pacific Concourse H) Call Meeting to Order IPR and Attendance Recording Reminder Comment Resolution and improvement of the Draft Recess until 10:30 Thursday Donald Eastlake 3rd, Sterllar Switches Donald Eastlake 3rd, Stellar Switches

21 Thursday, 16 July 2008 10:30 – 12:30 (Pacific Concourse I)
doc.: IEEE P /661r4 July 2009 Thursday, 16 July :30 – 12:30 (Pacific Concourse I) Call Meeting to Order IPR and Attendance Recording Reminder Comment Resolution and improvement of the Draft Recess until 16:00 Donald Eastlake 3rd, Sterllar Switches Donald Eastlake 3rd, Stellar Switches

22 Thursday, 16 July 2009 16:00 – 18:00 (Pacific Concourse I)
doc.: IEEE P /661r4 July 2009 Thursday, 16 July :00 – 18:00 (Pacific Concourse I) Call Meeting to Order IPR and Attendance Recording Reminder Discussion and Votes re Process / ad hocs / teleconferences “TGs Process, May”, 11-09/TBDr1 Motion: To direct the Editor to produce one or more revisions of the Draft so as to incorporate all changes and comment resolutions adopted before the end of this session. Adjourn sine die TGs Motto: Perfection is achieved not when there is nothing left to add but when there is nothing left to take away. Donald Eastlake 3rd, Sterllar Switches Donald Eastlake 3rd, Stellar Switches

23 [Reference Information]
July 2009 doc.: IEEE P /661r4 July 2009 [Reference Information] Updated PAR at Original PAR for IEEE ESS Mesh: 11-04/54r2. Original Five Criteria for IEEE ESS Mesh: 11-04/56r1. Comment Resolution Spreadsheet: 11-09/471r10: Resolution of Letter Ballot #147 Comments TGs Technical Editors: Kazuyuki Sakoda (Sony), Draft 2.03…D3.0… Anthony Maida (3eTI), Drafts 2.01 and D2.02 Avinash Joshi (Motorola), Drafts 1.09 through D2.0 W. Steven Conner (Intel). Drafts 0.01 through D1.08 (also chair of the first Mesh Study Group Session) Donald Eastlake 3rd, Sterllar Switches Donald Eastlake 3rd, Stellar Switches

24 [Earlier Meeting Minutes]
July 2009 doc.: IEEE P /661r4 July 2009 [Earlier Meeting Minutes] Task Group “s” Meeting Minutes May 2009, Montreal, Quebec, 11-09/595r0 March 2009, Vancouver, British Columbia, 11-09/312r0 January 2009, Los Angeles, California, 11-09/110r0 November 2008, Dallas, Texas, 11-08/1431r0 September 2008, Waikoloa, Hawaii, 11-08/1078r0 September 2008, ad hoc Meeting, Līhu‘e, Kaua‘i, Hawai‘i, 11-08/1038r0 July 2008, Denver, Colorado, 11-08/835r0 May 2008, Jacksonville, Florida, 11-08/580r2 May 2008, ad hoc meeting, Santa Clara, California, 11-08/539r0 March 2008, Orlando, Florida, 11-08/424r0 January 2008, Taipei, Taiwan, 11-08/170r2 November 2007, Atlanta, Georgia, 11-07/2826r1 Recent Teleconference Minutes May 6, 11-09/521r0 Donald Eastlake 3rd, Sterllar Switches Donald Eastlake 3rd, Stellar Switches


Download ppt "July 2009 Mesh Meeting Agenda"

Similar presentations


Ads by Google