2 Project Cost as per DPP Total Project Cost GOB RPA DPA Total 103,46.49
Figure in Lac BDT Total Project Cost GOB RPA DPA Total 103,46.49 899,99.99 56,19.36 1059,65.84

3 GOB = 103,46.49 Salary & Allowance = 6% VAT & Tax = 92% Other = 2%

4 v+t Contract Amount A + 100-(v+t) x A
A = Allocated amount without Tax and VAT v = Percentage of VAT t = Percentage of Tax

5 v+t Tax Calculation A + 100-(v+t) x A x Tax %
A = Allocated amount without Tax and VAT v = Percentage of VAT t = Percentage of Tax

6 v+t VAT Calculation A + 100-(v+t) x A x VAT %
A = Allocated amount without Tax and VAT v = Percentage of VAT t = Percentage of Tax

7 A = 1,000,000.00 v = 10 % t = 5%

8 Contract Amount 10,00,000+ 10+5 x 10,00,000 100-(10+5)

9 Contract Amount = 1,176,470.59 v = ? t = ?

10 Contract A = 1,176,470.59 v = 117,647.06 t = 58,823.53

11 A = 1,000,000.00 v = 7 % t = 3%

12 Contract Amount = 1,111,111.11 v = ? t = ?

13 Contract Amount = 1,111,111.11 v = 77,777.78 t = 33,333.33

14 Infra Sub-Project Bill Preparation and TAX-VAT deduction from bill

15 CD Sub-Project Bill Preparation Bank Statement Summary of Expenditure Others

16 Thanks


Download ppt "Discussion on Financial Management"

Similar presentations


Ads by Google