Presentation is loading. Please wait.

Presentation is loading. Please wait.

November 2005 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Technical Requirement sub-group report]

Similar presentations


Presentation on theme: "November 2005 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Technical Requirement sub-group report]"— Presentation transcript:

1 November 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Technical Requirement sub-group report] Date Submitted: [14 November, 2005] Source: [Alireza Seyedi] Company [Philips] Address [345 Scarborough Rd, Briarcliff Manor, NY, 10510] Voice:[ ], FAX: [ ], Re: [TG3c Technical Requirements sub-group] Abstract: [This document provides a report of the TG3c Technical Requirement sub-group between July and September 2005, and the future plan for the sub-group.] Purpose: [Report of sub-group activity since July 05 interim meeting.] Notice: This document has been prepared to assist the IEEE P It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P Alireza Seyedi, PHILIPS

2 doc.: IEEE 802.15-<doc#>
<month year> doc.: IEEE <doc#> November 2005 Outline Objective Status Selection Criteria document Review of major modifications made Clarification on Rate and Throughput definitions Items left to be discussed Technical Requirements related contributions General discussion and further work on the Selection Criteria document Future plan Alireza Seyedi, PHILIPS <author>, <company>

3 doc.: IEEE 802.15-<doc#>
<month year> doc.: IEEE <doc#> November 2005 Objective To create Technical Requirement (System Requirements and Selection Criteria) documents for the IEEE c Task Group. Alireza Seyedi, PHILIPS <author>, <company>

4 doc.: IEEE 802.15-<doc#>
<month year> doc.: IEEE <doc#> November 2005 Status To this date, the sub-group has held 20 conference calls and one ad hoc meeting. Average of 7.8 attendees Worked on TG3c Selection Criteria document “TG3c Selection Criteria” ( ) The sub-group completed the review and editing of the Selection Criteria Document Minutes: Alireza Seyedi, PHILIPS <author>, <company>

5 doc.: IEEE 802.15-<doc#>
<month year> doc.: IEEE <doc#> November 2005 Major modifications* Section 3: General Definitions Section 3.1. RF power measurements /calculations: Definition and Reference points for RF power (TX or RX) is given. Section 3.2. Eb/N0 reference point: Definition and Reference points for Eb/N0 is given. * An overview of major modifications is given here. For more accuracy and detail please refer to the Selection Criteria document. Alireza Seyedi, PHILIPS <author>, <company>

6 doc.: IEEE 802.15-<doc#>
<month year> doc.: IEEE <doc#> November 2005 Major modifications Section 6.3. Simultaneously Operating Piconets Test scenario was defined Linear geometry; Perfectly aimed Equal antenna gain for TX & RX (10dBi) Equal TX power Alireza Seyedi, PHILIPS <author>, <company>

7 doc.: IEEE 802.15-<doc#>
<month year> doc.: IEEE <doc#> November 2005 Major modifications It was decided that the “test” antenna gains in the link budget table are also set to 10dBi, both for TX and RX. It was decided that physical measurements are not required, and simulations and calculations are sufficient. (text is yet to be drafted) Alireza Seyedi, PHILIPS <author>, <company>

8 Clarification of definitions
<month year> doc.: IEEE <doc#> November 2005 Clarification of definitions PHY-SAP Payload Bit Rate: Data rate when the payload is being transmitted. See Section for definition and examples. Includes overhead due to FEC, etc Does not include overhead due to header preamble, IFS, ACK, etc PHY-SAP Throughput: Data rate that application sees See Section 6.2.3 Includes overhead due to header preamble, IFS, ACK, etc Alireza Seyedi, PHILIPS <author>, <company>

9 Items left to be discussed
<month year> doc.: IEEE <doc#> November 2005 Items left to be discussed Alireza Seyedi, PHILIPS <author>, <company>

10 Technical Requirements related contributions
<month year> doc.: IEEE <doc#> November 2005 Technical Requirements related contributions H. Ikeda, , “Coexistence Models Calculation Bases” A. Sadri, , “Wireless Display Throughput Requirements”. A. Seyedi, , “Data Rate Requirements”. Alireza Seyedi, PHILIPS <author>, <company>

11 doc.: IEEE 802.15-<doc#>
<month year> doc.: IEEE <doc#> November 2005 Future Plan Finish editing the Selection Criteria document by January interim meeting. Weekly teleconferences will continue 21st call: Date: To be announced Time: 8PM US eastern time Phone number: Pass Code: # Alireza Seyedi, PHILIPS <author>, <company>


Download ppt "November 2005 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Technical Requirement sub-group report]"

Similar presentations


Ads by Google