Presentation is loading. Please wait.

Presentation is loading. Please wait.

GSBPM and Data Life Cycle

Similar presentations


Presentation on theme: "GSBPM and Data Life Cycle"— Presentation transcript:

1 GSBPM and Data Life Cycle

2 Generic Statistic Business Process Model

3 Generic Statistic Business Process Model

4 GSBPM – Data Integration

5 Generic Statistic Information Model - GSIM

6 GSIM and GSBPM

7 GSIM – reference colours

8 GSBPM - Data Life Cycle

9 Specify Needs – Blue Path - Business

10 Functionality – Blue Path - Business
overall analysis of all available data and meta data

11 Supported by interpretation and analysis layer

12 Design – Blue Path - Business

13 Functionality – Blue Path - Business
Interaction between the statistical framework and the interpretation layer - eg. sampling

14 Functionality – Blue Path - Business
These sub processes can create active and passive metadata

15 Build – Yellow Path - Structures

16 Functionality – Yellow Path - Structures
For statistical outputs produced on a regular basis, this phase usually occurs for: First iteration Following a review Following a change in methodology

17 Functionality – Yellow Path - Structures
Each new output production line is basically a work flow configuration

18 Collect – Red Path - Exchange

19 Functionality – Red Path - Exchange
Typically this phase does not include any data transformations

20 Functionality – Red Path - Exchange
Controlled Data Collection – eg our survey Uncontrolled Data Collection – eg administrative sources may involve mapping < T, S, m> T – Target schema S – Source schema m – mapping

21 Process – Red Path - Exchange

22 Functionality – Red Path - Exchange
Typical ETL phase of a DWH happens in the Integration Layer Sub process 5.1 “integrate data” connects different sources and uses the provider management in order to update asynchronous business register status

23 Analyze – Green Path – Concepts

24 Functionality – Green Path – Concepts
The flow is bidirectional all non consolidated concepts must be first created and tested directly in the interpretation and analysis layer The Analysis phase includes: primary data scrutinizing interpretation to support the data evaluating the effective fitting of the Outputs with the initial expectations

25 Disseminate – Red Path - Exchange

26 Functionality – Red Path - Exchange
Manages the release of the statistical products to customers For statistical outputs produced regularly, this phase occurs in every iteration Ocurrs in the Acces Layer

27 GSBPM - Data Life Cycle

28 creative commons Thanks to UNECE on GSIM Thanks to UNECE on GSBPM Thanks to Centre of Excellence on Data Warehousing


Download ppt "GSBPM and Data Life Cycle"

Similar presentations


Ads by Google