Download presentation
Presentation is loading. Please wait.
1
2b. Status of WFD reporting
Update on status of reporting and validation process WGD meeting, 26 September 2012
2
State of Play RBMPs and WISE reporting
MS RBMP adopted WISE reporting RBMP reported XML GIS AT J ES K MT BE FI NL BG FR PL CY HU PT L CZ IE RO DE IT SE DK LT SI EE LU SK EL LV UK NOTES: Status: 24/03/2012 The column “RBMP adopted” reflects the contents of DG Environment’s web page: GREEN - River Basin Management Plans adopted! YELLOW - consultations finalised, but awaiting adoption. RED - consultation have not started or ongoing. The WISE reporting columns reflect if largely complete (green), partial (yellow) or no reporting (red) has been done on the three parts expected: - Copies of the RBMP and PoM XML files GIS files If the plan has not been yet been finalised and adopted it is assumed that the information submitted in WISE reflects draft plans.
3
State of Validation Process (26/09/12)
XML Feedback MS Response Spatial feedback AT ES ** MT BE FI NL BG FR PL CY HU PT CZ IE RO DE IT SE DK LT SI EE LU SK EL LV UK 'Feedback' = Report on issues from Atkins to MS; 'Response' = Explanation or correction by MS Step complete In process No action taken ** Incomplete XML submission
4
Update of Summary of WISE electronic delivery
5
WFD Master database imports
MS Import complete AT ES ** MT BE FI NL BG FR PL CY HU PT CZ IE RO DE IT SE DK LT SI EE LU SK EL LV UK NO **ES017 and ES018 incomplete
6
Activity since march 2012 Address issues as reported by MS
Development of further aggregation reports particularly for Blueprint products Migration to EEA of database Sept 2012 – EEA presentation to expand further
7
Thank you Mette Wolstrup, Atkins Denmark
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.