1 Critical Design Review Version 5.7.1 EDA Updates ECP0771

2 Change History since PDR
Design Review Slide # Description No issues found in PDR

3 Solution / Requirement
Design Review CORT tool will fill out Contract Completion Date with data pulled from EDA PDS web service. It represents Performance End Date from the contract. Performance End Date data element will be pulled from the XML document returned by the EDA PDS web service. This change will require updates to the contract nomination create and display processes. CEDA_ The CORT application will interface with the Electronic Document Access system for retrieval of contract related data in the format of the PDS schema. CEDA_ The CORT application will interface with the Electronic Document Access system for retrieval of contract related data in a formatted XML file.

4 Applications Needing Updates
Design Review Wide Area Workflow e-Business Suite [] iRAPT [] MRS [] CORT Tool [X] IUID Registry [] myInvoice [] eMIPR [] NCCS [] EDA SSO [] HAM/SAM/GAM/PMO []

5 Areas needing Updates Design Review Database [] Web [] Mobile []
Interfaces [X] Utilities [] EDI Vendor Inbound [] Other EDI/XML Inbound [] EDI/XML Outbound [] SFTP Inbound [] EDI/SFTP Guides [] EDI IC [] SUM/WBT []

6 [CORT] Transactional Database Changes
Design Review [CORT] Transactional Database Changes None

7 [CORT] Reporting Database Changes
Design Review [CORT] Reporting Database Changes None

8 COR – Create Contract Nomination
[CORT] Web Change – Screen Shot Design Review COR – Create Contract Nomination CEDA_ During COR nomination process, the CORT application will attempt to populate the Performance End Date data element from EDA when available. CEDA_ CORT application will fill out Contract Completion Date field with Performance End Date data element pulled from EDA.

9 [CORT] Interfaces Change
Design Review Performance End Date Contract Completion Date will be provided by the EDA PDS web service. CEDA_ The CORT application will interface with the Electronic Document Access system for retrieval of contract related data in the format of the PDS schema. CEDA_ The CORT application will interface with the Electronic Document Access system for retrieval of contract related data in a formatted XML file.

10