Presentation is loading. Please wait.

Presentation is loading. Please wait.

CMA on-site 2 Announcement

Similar presentations


Presentation on theme: "CMA on-site 2 Announcement"— Presentation transcript:

1 CMA on-site 2 Announcement
May 2008

2 Is it possible to measure WFD priority substances with currently applied methods at WFD relevant levels? Adressed to: Laboratories organising, commissioning and performing WFD compliance checking May 2008

3 Organised by JRC IES with support by ICPDR and the Slovak EI
CMA on-site 2 Budapest Hungary Danube River Organised by JRC IES with support by ICPDR and the Slovak EI May 2008

4 Collaborative field study: Comparison of monitoring methods on-site
River water samples (whole procedure including sampling) River water extract (measurement with real sample matrix) Standard solutions (instrumental measurement only) May 2008

5 Selected (challenging) organic WFD priority substances
Target Compounds PBDE PAH OCP Polycyclic Aromatic Hydrocarbons Polybrominated Diphenylethers OCP (to be confirmed) Others? Sampling and analysis according to current WFD chemical guidance draft document and WFD EQS proposal May 2008

6 Flexible site selection Sampling in main stream
Currently organising (to be confirmed) Ship-based sampling Flexible site selection Sampling in main stream Availability of laboratory space for sample preparation and packaging May 2008

7 ARGUS Serbian survey ship used during Joint Danube Surveys May 2008

8 Sending documentation and technical annex for final registration
Next step: Sending documentation and technical annex for final registration 11 interested laboratories so far In case of interest please contact May 2008


Download ppt "CMA on-site 2 Announcement"

Similar presentations


Ads by Google