Presentation is loading. Please wait.

Presentation is loading. Please wait.

IR Upgrade Possibilities for PEP-II

Similar presentations


Presentation on theme: "IR Upgrade Possibilities for PEP-II"— Presentation transcript:

1 IR Upgrade Possibilities for PEP-II
M. Sullivan Snowmass, 2001

2 Outline Scenarios to get above 1e34 Some Designs Summary outline

3 Some scenarios Present Machine Hoped for machine soon to be
After fixing known problems and errors and making some improvements Possible 1e34 machine No major IR modifications Possible 3e34 machines Possible modifications to IR optics

4 Present machine

5

6

7 IR pictures

8 Summary We think we can get to 5e33 with the present machine
We should be able to get to 1e34 without any major IR hardware changes Getting to 3e34 may require adding more focusing to the inside quadrupole (QD1) in order to get the small vertical spot size we want. We would do this by either replacing some of the existing B1 magnet with focusing slices or by replacing the PM Q1 with a superconductor. This introduces a small crossing angle which also gives us the option of filling every RF bucket with beam


Download ppt "IR Upgrade Possibilities for PEP-II"

Similar presentations


Ads by Google