Presentation is loading. Please wait.

Presentation is loading. Please wait.

Hard&Soft Contest, Suceava 2005 - Team of Timisoara LEEFT 3 : Lift (Elevator) Environment Forged Tenderly by the Team of Timisoara20.05.2005Slide 1 LEEFT.

Similar presentations


Presentation on theme: "Hard&Soft Contest, Suceava 2005 - Team of Timisoara LEEFT 3 : Lift (Elevator) Environment Forged Tenderly by the Team of Timisoara20.05.2005Slide 1 LEEFT."— Presentation transcript:

1 Hard&Soft Contest, Suceava 2005 - Team of Timisoara LEEFT 3 : Lift (Elevator) Environment Forged Tenderly by the Team of Timisoara20.05.2005Slide 1 LEEFT 3 : Lift (Elevator) Environment Forged Tenderly by the Team of Timisoara Hard & Soft Contest, Suceava 2005

2 Hard&Soft Contest, Suceava 2005 - Team of Timisoara LEEFT 3 : Lift (Elevator) Environment Forged Tenderly by the Team of Timisoara20.05.2005Slide 2 Presentation summary 1.Project 1 - Software 2.Project 2 - Hardware 3.Project 3 - Hybrid 4.Extensions: A.Working scaled model B.Multiple elevator shafts Contents

3 Hard&Soft Contest, Suceava 2005 - Team of Timisoara LEEFT 3 : Lift (Elevator) Environment Forged Tenderly by the Team of Timisoara20.05.2005Slide 3 Project 1 – Hardware Elevator model contains 4 floors, single elevator shaft. Elevator controller implemented using pure hardware: PIC microcontroller runs specialized algorithm; Hardware bundle: buttons, sensors, LEDs, RS232; GUI on the PC for signal display.

4 Hard&Soft Contest, Suceava 2005 - Team of Timisoara LEEFT 3 : Lift (Elevator) Environment Forged Tenderly by the Team of Timisoara20.05.2005Slide 4 Project 1 – Hardware (contd)

5 Hard&Soft Contest, Suceava 2005 - Team of Timisoara LEEFT 3 : Lift (Elevator) Environment Forged Tenderly by the Team of Timisoara20.05.2005Slide 5 Project 2 – Software Same elevator model as Project 1. Elevator controller implemented using GUI driven simulation: Similar algorithm to Project 1; Developed in Visual C ++; Neat visual interface.

6 Hard&Soft Contest, Suceava 2005 - Team of Timisoara LEEFT 3 : Lift (Elevator) Environment Forged Tenderly by the Team of Timisoara20.05.2005Slide 6 Project 2 – Software (contd)

7 Hard&Soft Contest, Suceava 2005 - Team of Timisoara LEEFT 3 : Lift (Elevator) Environment Forged Tenderly by the Team of Timisoara20.05.2005Slide 7 Project 3 – Hybrid Differences from previous projects: Multiple elevator shafts; Keypad on the floors, not inside the lift cage; Elevator controller implemented a combination of hardware and software: Algorithm; Dispatcher;

8 Hard&Soft Contest, Suceava 2005 - Team of Timisoara LEEFT 3 : Lift (Elevator) Environment Forged Tenderly by the Team of Timisoara20.05.2005Slide 8 Project 3 – Hybrid (contd) Multiple Elevator Shafts: Lifts working in tandem; Efficiency; Keyboard outside the lift cage: State-of-the-art in elevator field; Planning algorithm;

9 Hard&Soft Contest, Suceava 2005 - Team of Timisoara LEEFT 3 : Lift (Elevator) Environment Forged Tenderly by the Team of Timisoara20.05.2005Slide 9 Project 3 – Hybrid (contd)

10 Hard&Soft Contest, Suceava 2005 - Team of Timisoara LEEFT 3 : Lift (Elevator) Environment Forged Tenderly by the Team of Timisoara20.05.2005Slide 10 Working Scaled Model A working scaled model was built: DC motor – H-Bridge; Double Mechanical Reduction; Photo sensors on every floor; Counterweight;

11 Hard&Soft Contest, Suceava 2005 - Team of Timisoara LEEFT 3 : Lift (Elevator) Environment Forged Tenderly by the Team of Timisoara20.05.2005Slide 11 Working Scaled Model (contd)

12 Hard&Soft Contest, Suceava 2005 - Team of Timisoara LEEFT 3 : Lift (Elevator) Environment Forged Tenderly by the Team of Timisoara20.05.2005Slide 12 Prospects Some further developments: A.I. Algorithms; Database support; Safety issues


Download ppt "Hard&Soft Contest, Suceava 2005 - Team of Timisoara LEEFT 3 : Lift (Elevator) Environment Forged Tenderly by the Team of Timisoara20.05.2005Slide 1 LEEFT."

Similar presentations


Ads by Google