1 INTEGRATION LIU-PSB DUMP LIGNE BI LIGNE BT, BTM 15/08/2012 Crane…

2 PASSAGES DE CABLES 360-361 NIVEAU MACHINE PERIODE 15 PERIODE 1 PERIODE 16 PERIODE 14 PI PT SMV BSW GEN

3

4 ZONE A ZONE B ZONE C EVAC

5 Re-installation of large band pick up BR.WCM8L1; Impact 41642 BI.MTV30 (2 hublots),BI.MTV60 (8 hublots), BT.MTV30 (1 hublot); Impact 39744 Maintenance of the PSB tune system. Impact 40651 Remplacement pick-up UMA by BPSHV positions:BI.UMA20BI.UMA30BI.UMA40 (4 positions) BI.UMA50 (4 positions): Impact 38372 Replacement of BE-BI-PI transformers.BT.BCT.10; BTP.BCT10; BTM.BCT10; BTY.BCT112: Impact 37257 Maintenance FWS Booster; Impact 35921 Démontage/Rénovation/Remontage des transformateurs BI.BCT10, BI1.BCT20,BI2.BCT20, BI3.BCT20, BI4.BCT20; Impact 34611 Dismantling of 50 BLMs for repair and calibration and reinstall; Impact 34311 Replace the electronics of the SEM-grids BTM-line, Impact 27956 BT.UES40 : BT.UES10 tank MTV BTP..UES00: BTM.UES00 BTM:UES10 : BTY.UES120: BTY.UES152: Replace with new type pick up Impact 27754. Requires ECR Dedicated meeting to be organised by D.Hay directly after the PSB LS1 coordination meeting.. Invite P.Demarest, Jose Antonio Ferreira Somoza, Tobias, Delphine,

6 GEN

7

8

9

10 PASSAGES DE CABLES 360-361 NIVEAU MACHINE PI PT