Presentation is loading. Please wait.

Presentation is loading. Please wait.

TG3a Project Timeline Jan03 Session #22 Mar03 Session #23

Similar presentations


Presentation on theme: "TG3a Project Timeline Jan03 Session #22 Mar03 Session #23"— Presentation transcript:

1 TG3a Project Timeline Jan03 Session #22 Mar03 Session #23
January 2003 doc.: IEEE /056r0 TG3a Project Timeline January 2003 Jan03 Session #22 Complete TRD, Selection Criteria Doc, and Downselect Procedure Doc Mar03 Session #23 Proposals should be heard, criteria doc amended as needed May03 Session #24 Second round of proposals heard We should spend part of this session discussing proposals presented, answering technical questions/concerns (i.e. put the diehard engineers in a room and let them verbally duke it out). Spend time on conference calls discussing proposals to let everyone get comfortable (before and after this session). Criteria doc amended as needed Jul03 Session #25 Final round of presentations. Voting must occur here --start drafting process. Sep03 Session #26 proposals for draft improvements should be entertained at this time (i.e. now that we know the realm of the game, let the games begin) Nov03 Session #27 complete drafting process…seek approval to go to WG Letter Ballot Robert F. Heile, Appairent

2 TG3a Timeline PAR CFA 2002 Project Definition Downselect 2003 Draft D
January 2003 doc.: IEEE /056r0 January 2003 TG3a Timeline PAR CFA 2002 Project Definition Downselect 2003 Draft D J F M A M J J A S O N D J F M A M J J A S O N D Robert F. Heile, Appairent


Download ppt "TG3a Project Timeline Jan03 Session #22 Mar03 Session #23"

Similar presentations


Ads by Google