Download presentation
Presentation is loading. Please wait.
Published byHannah Margaret Lamb Modified over 5 years ago
1
ISD SG Closing Report Date: 2011-03-16 Authors: March 2012 March 2012
doc.: IEEE /0450r1 March 2012 ISD SG Closing Report Date: Authors: Stephen McCann, RIM Stephen McCann, RIM
2
March 2012 doc.: IEEE /0450r1 March 2012 Abstract Closing report for Infrastructure Service Discovery Study Group (ISD SG) for March 2012, Waikoloa, HI, USA Stephen McCann, RIM Stephen McCann, RIM
3
Summary Plans for May 2012 Two presentations on use cases:
March 2012 doc.: IEEE /0450r1 March 2012 Summary Two presentations on use cases: r0 r0 Extensive discussion on scope, although no final agreement was met. Plans for May 2012 Finalise scope for the SG Update use case & requirements document ( r1) Start on the PAR and 5C documents Stephen McCann, RIM Stephen McCann, RIM
Similar presentations
© 2025 SlidePlayer.com Inc.
All rights reserved.