Presentation is loading. Please wait.

Presentation is loading. Please wait.

Milton Green Street Milton Green Street Ramps and pedestrian walkway

Similar presentations


Presentation on theme: "Milton Green Street Milton Green Street Ramps and pedestrian walkway"— Presentation transcript:

1 Milton Green Street Milton Green Street Ramps and pedestrian walkway
Interpretive Signage Stormwater Capture and Bio-filtration Vegetated Stormwater Curb Extensions Native Tree and Shrub Landscaping Irrigation Funding: BHC = $745 K BHRCA = $125 K S.M. Bay Restoration Commission = $200 K Project Status: Implementation Milton Green Street

2 Milton Green Street Milton Green Street
Divert & Capture contaminated storm water run-off Construct vegetated buffers for water capture and infiltration Reduced first flush contamination effects Educational aspect; teaching students of MDRMS about water conservation and its importance Milton Green Street

3 Milton Green Street Milton Green Street

4 Milton Green Street

5 Baldwin Hills Park Master Plan Illustrative


Download ppt "Milton Green Street Milton Green Street Ramps and pedestrian walkway"

Similar presentations


Ads by Google