Download presentation
Presentation is loading. Please wait.
Published byBrianne Harned Modified over 10 years ago
1
Delivering Best-Practice Analytics through Analytics Center of Excellence (ACE) Hari Khamandula, DAKE @DakeACE
2
About Dake Solutions Is a Dake Group company Head Quartered in Johannesburg, South Africa Presence in Africa, Middle East, Asia and North America Specialises in Analytics, Business Intelligence, Operational Efficiency Serving utilities industry for over 15 years
3
Workflow and Operational Efficiency 1 2 3 4a4b 5 6 Analytics Real Time Typical Workflow © DAKE
4
Whats wrong with a Big Bang Approach? Define Requirements Create Blue Print Estimate Cost Motivate Budgets Assign Resources Create Detailed Design Ensure Quality BuildBuild © DAKE
5
Why not a Technology Driven Approach? ABCDEFGH ABdK CDEX You Vendor 1 Vendor 2 © DAKE
6
Why is Traditional Warehousing not the complete answer? Read Transactional Data Analyse transactional structures Model them into dimensional structures Build ETLs to transform the operational Data Store the volumes of Data Tune for performance Identify data patterns Run analytical calculations Present predictions © DAKE
7
Why cant the IT department alone service it? Request Service Report Typical IT Department Not Enough © DAKE
8
ACE - Analytics Center of Excellence driven by the Common Sense Business Approach Focused Team Structured Governance Defined Processes Apt Technologies © DAKE
9
Functional Overview Scalable Infrastructure Robust Framework Data Scientists Models Operational Systems © DAKE
10
Team Structure © DAKE
11
Architecture Overview DATA HUB (CIM Compliant) Operational Reporting Engine (ORE) Workflow Orchestration Engine (WOE) Data Warehouse Warehouse Administration Console (WAC) Meta Data Repository (MDR) Business Intelligence Engine (BIE) © DAKE
12
Case Study 1 Workflow Automation
13
The Challenge Papers driven Process Low transparency Over 20,000 users across the nation Regulatory targets
14
Approach National survey Analyse data Propose process changes Automate workflow Define performance indicators Accumulate data Manage Change Establish Analytics stream Define processes for continuous improvement © DAKE
15
Efficient Workflow Setup © DAKE
16
Case Study 2 Substation Automation
17
The Challenge Isolated device level substation data OT structures different to the IT structures Large volumes of real-time data Lack of communication within the grid
18
Common Substation Setup DeviceDevice DeviceDevice DeviceDevice Monitoring Devices Data Collector Device Level Monitoring and Control © DAKE
19
Data Server Setup DeviceDevice DeviceDevice DeviceDevice Monitoring Devices Data Collector Device Level Monitoring and Control InterfaceInterface Data Server All Substation Level Data All Substation Level Reporting © DAKE
20
The potential DAKE Substation Information Services Services Selective Object Level Data Rules Configuration Object Communication Setup (Rules Configuration) ALERTALERT © DAKE
21
Extending the potential… DAKE Substation Information Services (SDK) DAKE Substation Information Services (SDK) Rules Configuration ALERTALERTALERTALERT ALERTALERTALERTALERT INFOINFOINFOINFO INFOINFOINFOINFO © DAKE
22
Extending it further! ALERTALERTALERTALERT ALERTALERTALERTALERT ALERTALERTALERTALERT ALERTALERTALERTALERT Situational Awareness Centre INFOINFOINFOINFO INFOINFOINFOINFO INFOINFOINFOINFO INFOINFOINFOINFO © DAKE
23
Case Study 3 Situational Awareness Center
24
Visualization © DAKE
25
Use Case 1 WeatherAlert DAKE ACE Platform Modelled Analytical Data Equipment Impact Maintenance Impact Customer Impact GIS Visualisation © DAKE
26
Use Case 2 CoalSupply DAKE ACE Platform Modelled Analytical Data Customer Impact GIS Visualisation Generation Info Industrial Impact Revenue Impact © DAKE
27
Use Case 3 EquipmentFailures DAKE ACE Platform Modelled Analytical Data Interruption Impact GIS Visualisation OperationalMaintenance © DAKE
28
Thank you Questions? Visit: http://ace.dake.co.za
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.