A Savings for the Nation

Similar presentations


Presentation on theme: "A Savings for the Nation"— Presentation transcript:

1 A Savings for the Nation
A Savings for the Nation! Project Completion Dates (Pre-WRRDA, New Construction) Olmsted L/D Construction (2024) NOW 2019 Lower Mon 2,3 & 4 Replacement, phase 1 (2027) NOW 2023 Kentucky Lock Addition (2041) NOW 2023 Chickamauga Replacement Lock (2051) NOW 2026 L/D 25 Upper MS 1200’ Lock Addition (2064) NOW 2032 High Island to Brazos River, TX (2053) NOW 2018 Lagrange 1200’ Lock Addition (2070) NOW 2028 L/D 22 Upper MS 1200’ Lock Addition (2083) NOW 2035 L/D 24 Upper MS 1200’ Lock Addition (2090) NOW 2038 WRRDA policies were a great win for the inland industry but for taxpayers and the nation: review the status quo if WRRDA would not have been enacted…Tell them dates for completion now….

2 Project Completion Dates (Pre-WRRDA, Major Rehab)
Key Projects L/D 25 Upper MS Dam (2053) NOW 2030 Lagrange (2064) NOW 2018 ILL WW Thomas O’Brien L/D (2065) NOW 2023 Greenup Dam Rehab PED & Constr. (2079) NOW 2031


Download ppt "A Savings for the Nation"

Similar presentations


Ads by Google