Presentation is loading. Please wait.

Presentation is loading. Please wait.

DRAFT 22/02/2016 H u m a n i t a r i a n R e s p o n s e

Similar presentations


Presentation on theme: "DRAFT 22/02/2016 H u m a n i t a r i a n R e s p o n s e"— Presentation transcript:

1 DRAFT 22/02/2016 H u m a n i t a r i a n R e s p o n s e
Emergency Time Line ~ 90 Days DRAFT 22/02/2016 April / May / June MPA APA PHASE Preparedness Emergency Procedures Activation Assessments & Response C Early Warning Pred. & Monitoring Cyclone Alert Early Warning, Weather & Cyclone Alert Systems Monitoring, APA H u m a n i t a r i a n R e s p o n s e Alert Towards Early Recovery 18/02 15/03 21/03 25/03 30/03 D-7 D-5 D-3 D-2 D-1 D+1 D+2 D+3 D+5 D+7 D+14 D+30 TIME D - XX D 0 Call EAHCT Field Coordination & Assessment Team deployed Call EAHTC ACTION Preparedness Workshop (2) Preparedness Meeting EAHCT Assessment training & Workshop Preparedness Workshop OCHA lead Sector/cluster, partners preparedness (MPA) Deploy advance Assessment Teams Deploy OCHA field coordination staff in Townships Liaise with authority at all level Decide for surge Call ICCG MPA/APA SOP ready and shared with OCHA Sittwe International Organizations a& Local Organizations Workshop Call as many EAHCT and ICCG as required November 2011 March 2015


Download ppt "DRAFT 22/02/2016 H u m a n i t a r i a n R e s p o n s e"

Similar presentations


Ads by Google