Presentation is loading. Please wait.

Presentation is loading. Please wait.

GISC Melbourne Status Report

Similar presentations


Presentation on theme: "GISC Melbourne Status Report"— Presentation transcript:

1 GISC Melbourne Status Report
Doc 24 TT-GISC, Toulouse, February 2014

2 GISC Melbourne Status Report
WIS/TDCF Capacity Building in RA-V RA-V WIS/TDCF Training Workshop, 28 April – 3 May Countries participated the workshop. GISC Tokyo, GISC Beijing and GISC Seoul also made presentation to the Workshop. RA-V WIS Implementation Plan developed in Aug 2013, under auspice of RA-V WG-INF. Further training and preparation for the implementation of WIS/TDCF in Pacific Island Countries through on-site visit Nov 2013: PNG, Solomon Islands Mar 2014: Samoa, Kiribati, Nauru Apr 2014: Fiji, Vanuatu Jun: 2014: Cook Islands, Tonga Jul: 2014: Niue Aug 2014: Tuvalu 2 2

3 GISC Melbourne Status Report
GISC Melbourne Operation Operational since 16 April 2013 (Service Level: Category I – 24/7) Routine Metedata Synchronization with all Operational GISCs. All GTS products received by GISC Melbourne are in the Cache and kept for 5 days. Average Cache size 2.672GB. Average size of RA-V data MB. Improving monitoring capacity for GISC operation. Clean-up Metadata Catalogue, including publishing of outstanding metadata, ensuring the compliance of CPv1.3 for existing metadata, and coordinating and facilitate metadata update in RA-V GISC backup with Tokyo and Beijing in progress. 3 3

4 Thank you… Weiqing Qu Ph: (03)


Download ppt "GISC Melbourne Status Report"

Similar presentations


Ads by Google