Presentation is loading. Please wait.

Presentation is loading. Please wait.

HOTrak. HOTrak OVAR Rally January 2010 OVAR Rally setup Setup used 141 Module Sections. Mainline was 542 or 8.93 scale miles. Branch lines were 404 or.

Similar presentations


Presentation on theme: "HOTrak. HOTrak OVAR Rally January 2010 OVAR Rally setup Setup used 141 Module Sections. Mainline was 542 or 8.93 scale miles. Branch lines were 404 or."— Presentation transcript:

1 HOTrak

2 HOTrak OVAR Rally January 2010

3 OVAR Rally setup Setup used 141 Module Sections. Mainline was 542 or 8.93 scale miles. Branch lines were 404 or 6.65 scale miles in 7 separate branches. There were 146 sidings.

4 Some might think its a load of scrap

5 Others think were out of our Vulcan minds.

6 But we find it fun just to play around and enjoy our time

7 Everything is modular and designed to fit together

8 Some of our members like to give orders

9 Some of us just wander around the layout

10 Some are worker bees

11 But we enjoy the fruits of our labour. HONEY!

12 And then sell it to make a buck!

13 Good food solves a lot of problems

14 Honest, its a family restaurant!

15 Somehow, alcohol always gets involved!

16 ….but its not just trains, it can be trucks

17 ….or buildings

18 ….or scenes

19 We like to show off our best

20 But sometimes things go wrong with our best

21 And Rarely REALLY REALLY Wrong. Ooops!

22 But we make the best of those mishaps

23 Sometimes we have communications problems

24 Occasionally the police get involved

25 But vandalism still occurs

26 We try to be prototypical….

27 Here….the Italians went on strike!

28 We shop at Canadian Tire, and Princess Auto

29 We have passengers waiting at creative stations

30 Though were still looking for passengers at our main terminal

31 We do freight

32 And we do BIG freight

33 We do Passenger

34 Any era

35 Any age

36 Any road

37 Any continent

38 Local

39 Not so local

40 Any time of day

41 Late Afternoon

42 Or early evening

43 Or night

44 Any season, like Spring

45 Summer

46 Fall

47 Nuclear Winter

48 Anywhere……and I mean anywhere???

49 Were on the almost straight!

50 And narrow

51 Some of us may be looking for god

52 And occasionally the hand of god does visit!

53 But we call him Jacques!

54 Once youre hooked

55 You need to feed your need

56 We dont just stand around

57 We love to tell big fish stories

58 But the best part is just sitting around and chatting with good friends

59 But not necessarily ALL together!!!

60 HOTrak is a great place to go!!!

61 And get down to track level and just enjoy the views


Download ppt "HOTrak. HOTrak OVAR Rally January 2010 OVAR Rally setup Setup used 141 Module Sections. Mainline was 542 or 8.93 scale miles. Branch lines were 404 or."

Similar presentations


Ads by Google