Presentation is loading. Please wait.

Presentation is loading. Please wait.

6th Address Policy SIG Report

Similar presentations


Presentation on theme: "6th Address Policy SIG Report"— Presentation transcript:

1 6th Address Policy SIG Report
Takashi Arano Chair of APNIC Address Policy SIG Intec NetCore, Inc.

2 History 1st SIG:Korea, Mar. 2000 2nd SIG:Brisbane, Oct. 2000
3rd SIG: KL, Mar. 2001 4th SIG: Taipei, Aug. 2001 5th SIG: Bangkok, Mar. 2002 6th SIG: Kita-Kyushu, Sep. 2002

3 Overview 11 presentations in 3 sessions
Long, tough but fruitful discussions reached several rough consensus.

4 Consensus Reached Critical infrastructure assignments
Consider as special? Need policy? (v4/v6) -- YES Proposed criteria? Root DNS gTLD/ccTLD name servers IXs IANA/RIRs/NIRs From which block?(v4) -- Swamp (202/7) Assignment Size? (v6) /32 for routable (DNSs and registries) /48 for non-routable (IXs) Technical considerations might be added later.

5 Consensus Reached (II)
Revised AS number policy The proposed amendment to let LIRs assign non-portable ASN to their customers was supported. The final call for comments will be re-posted soon. Experimental internet resource assignments General idea was supported. Secretariat to take steps to implement the proposal. Internet Resources for documentation purposes General idea proposed was supported. Address block area should be discussed more

6 Consensus (III) IPv4 Allocations by LIRs to ISPs
General idea was supported. Secretariat to implement the proposal Needs additional support document to help LIRs to decide allocation sizes. Some notes about NIR and LIR Address space NIRs can allocate is portable, but what LIRs can do is non-portable Only LIR customers can receive non-portable allocations.

7 Other Informational Topics
6bone Migration plans - a proposal Update on opinions on RFC2050 in Japan  Opinions will be fed back to 6bone community and 2050-wg, respectively. Large Space IPv4 Trial Usage Program for Future IPv6 Deployment Deployment Status of Wireless LAN Services Tried Co-Chair Election, but no one applied. Continues to make efforts to find out.

8 New systems successfully introduced
“Rapporteur” works well to help people understand 2 projectors desired Language translation service stimulates discussion More evaluation expected Needs a lot of preparation in advance, including meeting with interpreters Multi-lingual?

9 Thank you for your cooperation!
Co-chairs?? Will call for co-chairs again in ML. Thank you for your cooperation!


Download ppt "6th Address Policy SIG Report"

Similar presentations


Ads by Google