Crittenden County Erosion Control Project
Crittenden Conservation District Project # July 1, 2009 – December 31, 2010
2
Crittenden County
3
Mission To educate landowners on the value and importance of protecting crop land and improving water quality.
4
Partners Land Owners and Farmers ANRC EPA 319 Program USDA, NRCS
5
Goals Reduce Erosion Improve Water Quality
Improve Irrigation Efficiency By controlling water flow.
6
Actions Develop Best Management Practices
Install pipe drops & water control structures Water was moving unchecked across the field and into the ditch Major gully erosion
7
Getting Started Survey needs of landowners Results being:
Loss of crops and cropland Landowners were willing to share expenses for improvement by participating in the 50% Erosion Control cost share project
8
Plan of Work Advertise Sign up and Application period Map locations
Provide Technical Assistance Bid ad placed in newspaper Bids awarded to venders and contracts signed Invoiced and signed contracts with participants Order pipes Inspection with GPS locations
9
Erosion from poor drainage
10
Water Control Structure
11
Complete water control structure
12
Drop pipe installed with stabilization rocks
13
Pipe with water control structure
14
Project Results: 4,844 ft of pipe/177 pipes
133 Water Control Structures Total Project Cost: $187,632.00 Project: 4,844 ft of pipe/177 pipes 133 Water Control Structures 28 Elbows