April 2011, Bucharest The regionalisation project of Compania Apa Brasov.

Similar presentations


Presentation on theme: "April 2011, Bucharest The regionalisation project of Compania Apa Brasov."— Presentation transcript:

1 April 2011, Bucharest The regionalisation project of Compania Apa Brasov

2 Regionalisation case study Compania Apa Brasov presentation Investment programs Procurement plan (Cohesion Fund)

3 population served: over 350,000 delivered water: 17.5 mil. c.m./ year waste water: 21 mil. c.m./year annual turnover: 16 mil. Euro no. of employees: 750 Compania Apa Brasov 2010 Key Figures

4 Present operation area Short term covered operation area Long term covered operation area Agglomerations in the project: - Brasov (~370.000 inhab.); - Codlea (~23.000 inhab.); - Rupea (~19.000 inhab.); - Prejmer (~25.000 inhab.); - Bran-Moieciu (~7.000 inhab.).

5 Compania Apa Brasov Investment programs

6

7 PROGRAMME VALUE – 23,685,720 USD LOAN VALUE – 9,218,000 USD LOAN PERIOD – 15 years GRACE PERIOD – 3 years REIMBURSEMENT PERIOD – 1998 – 2009 IMPLEMENTATION PERIOD – 1995 – 2001

8 DRINKING WATER PROJECTS Rehabilitation of Tarlung WTP – 1 unit out of 4 Rehabilitation of Brasov drinking water network Installation of water meters to consumers Installation of bulk meters at the sources and pumping stations Pressure monitoring system Reequipment of one underground source WASTEWATER PROJECTS Rehabilitation of Brasov Waste water Treatment Plant Rehabilitation of one sewerage collector

9

10

11 Large Scale Infrastructure Facilities PROGRAMME VALUE - 3,5 mil. EURO SCOPE – Development of the sewerage system BENEFICIARY LOCALITIES – Hărman (4,630 inhabitants) – Sânpetru (3,500 inhabitants) IMPLEMENTATION PERIOD: 2000 – 2002

12

13 Financing plan: ISPA grant – 71.0% BERD loan – 24.66% APA Braşov contribution – 4.34% Programme value - 58,708,624 EURO (first alocation) 46,18,891 EURO (final value) Implementation period: 2002 - 2010 Instrument for Structural Policies for Pre-accession

14 ROMANIAN GOVERNMENT MINISTRY OF ENVIRONMENT AND SUSTAINABLE DEVELOPMENT Project financed by EUROPEAN UNION COUNTY COUNCIL BRASOV EUROPEAID/119083/D/SV/RO, ISPA Measure no. 2003/RO/16/P/PA/013-4 TECHNICAL ASSISTANCE FOR PROJECT PREPARATION IN THE WASTEWATER AND DRINKING WATER SECTOR IN ROMANIA REHABILITATION AND EXTENSION OF THE WATER SUPPLY AND SEWERAGE SYSTEMS IN BRASOV COUNTY, ROMANIA

15 GENERAL DESCRIPTION OF THE EXISTING SITUATION Drinking water treatment plants Old and obsolete equipment; Frequent damages; Drinking water does not meet the necessary quality according to the EU Drinking Water Directive; Transmission pipes Long sectors made of asbestos cement or steel, with frequent damages; Considerable leakages on the transmission pipes; Insufficient development of the systems / more transmission pipes required. Storage tanks Damages of the storage tanks; Hydraulic installation corroded, with long service life and with often damages; Insufficient development of the systems / more reservoirs required.

16 EXISTING SITUATION Pumping stations Poor condition of the buildings of the pumping stations; Equipment with long service life, low efficiency and high energy consumption; Insufficient development of the systems / more pumping stations required. Distribution network Pipes made of unsuitable materials (steel, asbestos cement), with long service life, corroded and in poor condition; High leakages; Insufficient coverage of the residential areas.

17 EXISTING SITUATION Sewerage network Insufficient coverage of the residential areas in all agglomerations; Considerable length of the network over 20 years old; No adequate equipment for operation and maintenance; Frequent blockages and damages. Wastewater pumping stations Equipment with long service life with high energy consumption due to low efficiency; Mechanical and electrical installations is extensively corroded; Frequent damages and interruptions in operation. Wastewater treatment plant Totally or partially out of order in all agglomerations; Non-compliance with the requirements of NTPA 001/2002 and EU Wastewater Directive; More WWTPs required.

18 OBJECTIVES AND ACHIEVEMENTS Overall objective To improve the infrastructure in the water sector for the benefit of the environment and man in order to meet the water compliance obligations in the Accession Treaty and the objectives of the SOP Environment. Main achievements In the field of water supply Provision of drinking water meeting the standards of EC Drinking Water Directive 98/83/EC; Providing with good quality drinking water to the population; Assurance of quality and availability for water related services according to the principles of maximum cost efficiency and quality in operation and population affordability; Improved security of supply through replacement of structurally defective mains; Reduced physical water losses.

19 OBJECTIVES AND ACHIEVEMENTS In the field of wastewater collection and treatment Better quality of surface waters and environment by minimizing the effects of human settlements; Mitigation of health risk by extending the sewerage network to serve population currently dependent on on-plot waste disposal facilities with reduction in associated risk of surface and ground water pollution; Reduction of infiltration in the system; Compliance with the treatment standards of the Urban Wastewater Treatment Directive 91/271/EEC for discharge into non-sensitive water body; Reduced pollution of the rivers Vulcanita, Ghimbasel, Olt and Danube due poorly treated wastewater effluent.

20 INVESTMENT OBJECTIVES Item Component TOTAL (MEuro) 1 New transmission pipe Tarlung – Dealul Melcilor (15.8 km, Dn 1200 mm) 21.6 2 New transmission pipe Tarlung – Sacele (5.4 km, Dn 500 mm) 2.4 3 New transmission pipe Stupini – Feldioara (15.5 km, Dn 315 mm) 3.7 4 New transmission pipe Sanpetru – Bod (6.7 km, Dn 315, 500 mm) 1.6 5 Rehabilitation of the distribution network in Brasov (47 km) 9.3 6 Rehabilitation of distribution network in Sanpetru (14.8 km) 1.6 7 Rehabilitation of distribution network in Harman (16 km) 1.6 8 SCADA, automation and control 0.6 TOTAL (MEuro)42.4 CLUSTER BRASOV – WATER (except Codlea agglom.)

21 INVESTMENT OBJECTIVES CLUSTER BRASOV – WASTEWATER (except. Codlea aggl.) Item Component TOTAL (MEuro) 1 Rehabilitation and extension of the wastewater collection system in Brasov (18.7 km) 1.4 2 Rehabilitation and extension of the wastewater collection system in Sacele (11.4 km) 2.1 3 Rehabilitation and extension of the wastewater collection system in Stupini (10.5 km) 1.9 4 Wastewater collector Cristian - Brasov WWTP – Feldioara (25.5 km) 11.4 5 Rehabilitation of the wastewater treatment plant Brasov (500.000 p.e.) 24.3 6 Extension of the wastewater collection system in Feldioara (11.5 km) 1.9 7 New wastewater treatment plant in Feldioara (142.000 p.e.) 22.1 TOTAL (MEuro)65.1

22 INVESTMENT OBJECTIVES AGGLOMERATION CODLEA - WATER ItemComponent TOTAL (MEuro) 1 Rehabilitation of drinking water treatment plant Codlea (chlorination) 0.8 2 New drinking water pumping station Ghimbav 0.4 3 New drinking water transmission pipe Codlea-Ghimbav (6.0 km Dn 315 mm) 2.4 4 Rehabilitation of water reservoirs in Codlea 0.5 5 Rehabilitation and extension of the distribution network in Codlea (15.1 km) 1.5 6Water metering0.1 7 SCADA, automation and control 0.2 TOTAL (MEuro)5.9

23 INVESTMENT OBJECTIVES AGGLOMERATION CODLEA - WASTEWATER ItemComponent TOTAL (MEuro) 1 Rehabilitation and extension of the wastewater collection system in Codlea (12.2 km) 2.3 2 Wastewater collector Codlea-Feldioara (18.6 km) 6.4 TOTAL (MEuro)8.7

24 INVESTMENT OBJECTIVES AGGLOMERATION RUPEA - WATER Item Component TOTAL (MEuro) 1 Rehabilitation of Dopca transmission pipe (3.0 km, Dn 400 mm) 1.8 2 Rehabilitation of drinking water treatment plant Bogata 2.6 3 Rehabilitation of the distribution network Hoghiz (9.0 km) 1.1 4 Rehabilitation of the distribution network Rupea (12.7 km) 1.1 5Water metering0.1 6 SCADA, automation and control 0.2 TOTAL (MEuro)6.9

25 INVESTMENT OBJECTIVES AGGLOMERATION RUPEA - WASTEWATER Item Component TOTAL (MEuro) 1 Rehabilitation of the wastewater collection system in Rupea (18 km) 4.3 2 Extension of the sewerage collection system in Cart. Gara Rupea (1.0 km) 0.2 3 Sewerage collection system in Homorod (5.7 km) 1.1 4 Sewerage collection system in Hoghiz (9.5 km) 1.8 5 New wastewater treatment plant in Hoghiz (22.000 p.e.) 5.2 TOTAL (MEuro)12.6

26 INVESTMENT OBJECTIVES AGGLOMERATION PREJMER - WATER Item Component TOTAL (MEuro) 1 Extension of distribution network in Prejmer (32.6 km) 3.0 2 SCADA, automation and control 0.2 TOTAL (MEuro)3.2

27 INVESTMENT OBJECTIVES AGGLOMERATION PREJMER - WASTEWATER Item Component TOTAL (MEuro) 1 Extension of wastewater collection system in Prejmer (32.0 km) 5.4 2 Extension of the wastewater treatment plant Lunca Calnicului (16.000 p.e.) 3.7 TOTAL (MEuro)9.1

28 INVESTMENT OBJECTIVES AGGLOMERATION BRAN-MOIECIU - WATER Item Component TOTAL (MEuro) 1 Water treatment plant Moieciu (chlorination) 0.4 2Water reservoir Moieciu0.2 3 Extension of distribution network in Moieciu (17.5 km) 1.9 4Water metering0.1 5 SCADA, automation and control 0.2 TOTAL (MEuro)2.8

29 INVESTMENT OBJECTIVES AGGLOMERATION BRAN-MOIECIU - WASTEWATER Item Component TOTAL (MEuro) 1 Extension of the wastewater collection system in Moieciu (16.9 km) 3.1 2 Wastewater treatment plant Bran-Moieciu (5.800 p.e.) 1.2 TOTAL (MEuro)4.3

30 INVESTMENT OBJECTIVES Item Component TOTAL (MEuro) 1Cluster Brasov – Water (except Codlea)42.4 107.5 2Cluster Brasov – Wastewater (except Codlea)65.1 3Agglomeration Codlea - Water5.9 14.6 4Agglomeration Codlea - Wastewater8.7 5Agglomeration Rupea - Water6.9 19.5 6Agglomeration Rupea - Wastewater12.6 7Agglomeration Prejmer - Water3.2 12.3 8Agglomeration Prejmer - Wastewater9.1 9Agglomeration Bran-Moieciu - Water2.8 7.1 10Agglomeration Bran-Moieciu - Wastewater4.3 TOTAL (MEuro)161.0

31 No.Contract Estimated value of the contract (lei) Value of the budget publised in SEAP (lei) Value of the contract (lei) Type of contract Tender notice (date) Submission deadline for the tenders Contract signing (date) Date of contract commencement Contract completion date (without Defect Notification Period) CS1 Technical Assistance for project management/for project implementation 20.126.871services27.01.201121.03.201113.05.201105.07.201130.12.2013 CS2 Technical Assistance for Supervision of Works 40.253.742 27.354.051 17.807.352,26services22.07.200923.09.200926.10.200908.02.201015.06.2014 CW1 Rehabilitation of Brasov wastewater treatment plant 111.383.824 84.150.000 works16.06.201009.08.201001.02.201105.03.201130.12.2013 CW2 New wastewater treatment plant in Feldioara 101.226.613 73.000.000 53.760.703,55works09.09.200925.11.200905.03.201012.04.201012.06.2013 CW3 Rehabilitation of water treatment plants in Codlea, Moieciu and Bogata-Rupea 28.383.922works28.02.201114.04.201127.05.201111.07.201111.07.2013 CW4 New wastewater treatment plant in Hoghiz, for Rupea Agglomeration 23.877.833 17.100.000 15.773.540,00works08.10.200920.01.201015.06.201029.07.201029.07.2012 CW5 Extension of Lunca Calnicului WWTP (line2) and new WWTP in Moieciu 22.140.54515.800.00011.368.499,75works30.10.200917.02.201017.05.201007.06.201007.12.2012 CW6 New transmission pipe Sânpetru - Bod 7.052.7951.877.666,19works Finished contract -25.06.200701.10.200701.07.2008

32 No.Contract Estimated value of the contract (lei) Value of the budget publised in SEAP (lei) Value of the contract (lei) Type of contract Tender notice (date) Submission deadline for the tenders Contract signing (date) Date of contract commencement Contract completion date (without Defect Notification Period) CW7 Extension and rehabilitation of water transport in Agglomeration Braşov - Săcele 108.624.895works01.06.201110.08.201118.10.201118.11.201130.12.2013 CW8 New wastewater collectors Ghimbav - Braşov WWTP - Feldioara WWTP, Codlea - Feldioara WWTP and new transmission pipe Stupini - Feldioara 98.472.617 works25.03.201125.05.201122.07.201119.09.201130.12.2013 CW9 Extension and rehabilitation of drinking water distribution networks and sewerage networks in, Sanpetru and Harman 92.905.400 works25.05.201108.08.201118.10.201128.11.201130.12.2013 CW10 Extension and rehabilitation of drinking water distribution networks and sewerage networks in Codlea and Moieciu 55.662.299 works29.04.201108.07.201123.09.201114.10.201129.09.2013 CW11 Extension and rehabilitation of drinking water distribution networks and sewerage networks in Agglomeration Rupea and Prejmer 84.500.285 66.293.029 works4.12.201031.01.201106.05.201104.06.201130.12.2013 TOTAL794.611.641 100.587.761, 75

33 Multumesc ! Thank you ! Jakarta, Water connections