Download presentation
Presentation is loading. Please wait.
3
Kneib, Neri, Smail et al. A&A, 2005 Kneib et al. in preparation, 2006
SMM z=2.516
4
Alcolea et al. in preparation
CO(2-1) W2005/2006 OLD AB = 0.88” x 0.80” Alcolea : NEW AB = 0.47” x 0.29” Bujarrabal et al. ApJ 504, 915, 2006 Alcolea et al. in preparation
9
Observing with the PdBI
15
(320, 160, 80, 40)
17
Observing with the PdBI
24
Science Operations Group
You Science Secretary Proposal Submission Program Committee Technical Screening Science Operations Group Science Coordinator Director
27
Looking forward to the March 2007 proposal deadline …
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.