1 Drilling Performance Optimization Initiatives
Criterion Drilling Performance Optimization Initiatives

2 Drilling Performance Optimization
RigMinder Drilling Optimization Rig KPI and Benchmarking Drilling Monitoring and Intervention ENGINEERED DECISIONS & ANALYSIS Drilling Optimization is really a combination of three things; Rig KPI & Benchmarking - Flat Time Performance, Rig Reliability & controlling NPT, Analysis and updating the rigs Operational SOP’s and making sure our operational personnel have the knowledge they need efficiently drill wells for our customers. 2) Drilling Montering and Intervention –Which mostly is done by the Field based Drilling Optimization engineers spread throughout the fleet. 3) Engineering Decisions and Analysis – Which really is lead by the Specialist in the RTOC along with James, Daniel and the rest of the operational team/

3 Another example lies in Trinidad 125 where we provided full service in Drilling Optimization.
Overall Flat Time Performance Increase of 41.5% over a 3 well time frame. See Slides 1-4 Trinidad 125 went from customer threatening non-renewal of contract to becoming the Operators top performer out of 19 rigs. How? We didn’t have the superintendent go to location every day with a big stick, we focus on Training and teaching our people, not just to focus on what’s above the rotary, but what happens below it to distinguish ourselves as a true Performance Driller.

4 Optimization through Intelligent Design & Engineering
Productive Time Technical Limit Time ILT NPT Prior to the commencement of each section: Modeling of the predicted loads while drilling, casing, and cementing Summary of loads and recommended of changes when necessary

5 Optimization through Intelligent Design & Engineering
Productive Time Technical Limit Time ILT NPT Real time Monitoring & Analysis of Loads and Limits Hindcast Overlay of measured loads vs. calculated loads Forecast Projection of loads to TD for a range of sensitivities

6 Drilling Performance Optimization
Sept – Dec Discovery, 225 Parsley, 133 Pioneer Jan – 2018 – 430 RiverBend, 53 Yangarra Feb – 2018 – 109 XTO March – 2018 – HALO1 Demo, 129 April – 2018 – 429 Verado May – 2018 – ADC 62, ADC 63 June – 2018 – 125 July – 2018 – 223 Resivior, 100 Parsley – Still Projected to Install on Trinidad 223 for Parsley August – 2018 – Projected 224 Parsley, 226 Parsley, 137 Pursuit O&G Sept – 2018 – 120 Conoco Phillips, 134 Pioneer, October – 2018 – 134 Pioneer, 136 Pioneer, HAL01 November – 2018 – 142 Pionee2, 54 Pioneer, Undetermined December – Undetermined, Undetermined, Undetermined Projected numbers could be increased if the Manpower is upped in Manufacturing / QC and Field Technicians Target to deploy on all Parsley Rigs End of August – RigMinder EDR & Personnel critical in execution of Performance Optimization plan. Target to Deploy on all Pioneer Rigs by end 2018 – Second Contractor targeted to ne supported by Performance Team 2019 focus on XTO Continue to rig up on all rigs secured by TDG & RigMinder Business Development teams

7 Drilling Performance Optimization
Sept – Dec Discovery, 225 Parsley, 133 Pioneer Jan – 2018 – 430 RiverBend, 53 Yangarra Feb – 2018 – 109 XTO March – 2018 – HALO1 Demo, 129 April – 2018 – 429 Verado May – 2018 – ADC 62, ADC 63 June – 2018 – 125 July – 2018 – 223 Resivior, 100 Parsley – Still Projected to Install on Trinidad 223 for Parsley August – 2018 – Projected 224 Parsley, 226 Parsley, 137 Pursuit O&G Sept – 2018 – 120 Conoco Phillips, 134 Pioneer, October – 2018 – 134 Pioneer, 136 Pioneer, HAL01 November – 2018 – 142 Pionee2, 54 Pioneer, Undetermined December – Undetermined, Undetermined, Undetermined Projected numbers could be increased if the Manpower is upped in Manufacturing / QC and Field Technicians Target to deploy on all Parsley Rigs End of August – RigMinder EDR & Personnel critical in execution of Performance Optimization plan. Target to Deploy on all Pioneer Rigs by end 2018 – Second Contractor targeted to ne supported by Performance Team 2019 focus on XTO Continue to rig up on all rigs secured by TDG & RigMinder Business Development teams

8 Drilling Performance Optimization
Sept – Dec Discovery, 225 Parsley, 133 Pioneer Jan – 2018 – 430 RiverBend, 53 Yangarra Feb – 2018 – 109 XTO March – 2018 – HALO1 Demo, 129 April – 2018 – 429 Verado May – 2018 – ADC 62, ADC 63 June – 2018 – 125 July – 2018 – 223 Resivior, 100 Parsley – Still Projected to Install on Trinidad 223 for Parsley August – 2018 – Projected 224 Parsley, 226 Parsley, 137 Pursuit O&G Sept – 2018 – 120 Conoco Phillips, 134 Pioneer, October – 2018 – 134 Pioneer, 136 Pioneer, HAL01 November – 2018 – 142 Pionee2, 54 Pioneer, Undetermined December – Undetermined, Undetermined, Undetermined Projected numbers could be increased if the Manpower is upped in Manufacturing / QC and Field Technicians Target to deploy on all Parsley Rigs End of August – RigMinder EDR & Personnel critical in execution of Performance Optimization plan. Target to Deploy on all Pioneer Rigs by end 2018 – Second Contractor targeted to ne supported by Performance Team 2019 focus on XTO Continue to rig up on all rigs secured by TDG & RigMinder Business Development teams

9 Drilling Performance Optimization
Sept – Dec Discovery, 225 Parsley, 133 Pioneer Jan – 2018 – 430 RiverBend, 53 Yangarra Feb – 2018 – 109 XTO March – 2018 – HALO1 Demo, 129 April – 2018 – 429 Verado May – 2018 – ADC 62, ADC 63 June – 2018 – 125 July – 2018 – 223 Resivior, 100 Parsley – Still Projected to Install on Trinidad 223 for Parsley August – 2018 – Projected 224 Parsley, 226 Parsley, 137 Pursuit O&G Sept – 2018 – 120 Conoco Phillips, 134 Pioneer, October – 2018 – 134 Pioneer, 136 Pioneer, HAL01 November – 2018 – 142 Pionee2, 54 Pioneer, Undetermined December – Undetermined, Undetermined, Undetermined Projected numbers could be increased if the Manpower is upped in Manufacturing / QC and Field Technicians Target to deploy on all Parsley Rigs End of August – RigMinder EDR & Personnel critical in execution of Performance Optimization plan. Target to Deploy on all Pioneer Rigs by end 2018 – Second Contractor targeted to ne supported by Performance Team 2019 focus on XTO Continue to rig up on all rigs secured by TDG & RigMinder Business Development teams