Presentation is loading. Please wait.

Presentation is loading. Please wait.

Lifecycle Data Management An EPC&M Perspective

Similar presentations


Presentation on theme: "Lifecycle Data Management An EPC&M Perspective"— Presentation transcript:

1 Lifecycle Data Management An EPC&M Perspective
Peter Moore Vice President, Project Execution Services October, 2009

2 Lifecycle Data Management (LDM) Agenda
Overview Challenges and Goals LDM – The Owner’s Perspective LDM – An EPC&M Perspective FLUOR’s Approach to LDM Maintenance: Planning, Needs, Deliverables Construction Strategic Supply Chain Partners Next Generation Project Execution Summary AV\filename.ppt

3 Lifecycle Data Management Overview
define new requirements design & engineer in concept construction and precommissioning documents in detail prefabricate construct & precommission manufacture & assemble procure goods & services activity model contracts goods specs & scopes POs prefab units facility define modification analyze performance perform operations handover & commission maintenance decommission & disassemble demolish & dispose . operational data on-line off-line environment acquire feedstock sell product operation-ready facility maintenance data documents for AV\filename.ppt

4 Challenges and Goals An Owner’s Perspective
Maximize rate of return from capital investment. Minimize operating costs. Optimize trade-offs between initial CAPEX versus operating reliability, lifecycle costs and facility flexibility. Minimize risks associated with late launch (lack of data), unpredictable product throughput, unreliable supply chains, health/safety/environmental. Opportunity for improvement through, state of the art technology, supply chain integration, first to market entry. AV\filename.ppt

5 Challenges and Goals An EPC&M Perspective
Manage large multi-location, multi-entity projects (data availability/consistency) Work seamlessly together with Supply Chain Partners (equipment vendors, logistics companies, local subcontractors), client and other EPC companies. Focus on quality of Facility Design, Construction and Operations. Manage hundreds of thousands of pieces of information, accurately and in a timely manner Execute in a Healthy and Safe Environment Do this over and over again from project to project -> utilize industry standards (drive culture and data handover standards) AV\filename.ppt

6 Fluor’s Approach to LDM
Develop an integrated program (UpFrontTM) to identify the integral aspects that contribute to a successful plant at start-up (alignment with all invested parties). Seamless integration between Engineering, Construction and O&M, resulting in high-fidelity information (SPE, SPC, SPO). Develop relationships with Key Suppliers (Strategic Relationship Agreements) Development of a “next generation” integrated project execution environment (SmartPlantTM Enterprise) AV\filename.ppt

7 Maintenance Fluor’s UpFrontTM Program
NEEDS Establish automated transfer of data needed to create and run RAM model from SmartPlant and IVARA Provide reference screens to designers for statistics generated by RAM model Enable what-if RAM analysis for configuration options (RAM: Reliability, Availability, Maintainability) Establish simulation options to compute optimum repair response work force, rebuild strategies, and capital spares STANDARD DELIVERABLES Spare parts Instrument data Equipment specs Maintenance procedures Vendor data Piping ISOs AV\filename.ppt

8 Fluor’s Construction Environment CompleteITSM and InVISIONSM
Punch List Reports Custom Preservation Quality Verifying Documents Status Document Views Completion Certificates Functional Test Procedures Consolidated and Verified Data For O&M Consolidates Completion (Turnover) data into one centralized system. Forces Consistency and Completeness in Construction Planning Enables Lifecycle Data Mgmt InVision color codes the 3D model based on the data that has been linked to it. Quickly locates: line, spool, Iso, tagged items, hydrotest package and turnover package Reviews : Iso’s AFC status Warehouse Material availability Spool forecasted availability based on fabricator’s ETA Field progress Status Reports - quantities completed/ not completed/ % to go/ curves Completion Certificates - Constr Comp, Mech Comp, TCCC Preservation - routine checking and maintenance of equip during construction Quality Verifying Documents - QA installation checklist Functional Test Procedures - precommissioning tests Document Views - turnover P&ID’s, graphic files, equipment datasheets, start-up procedures, etc. etc. AV\filename.ppt

9 Fluor’s Strategic Relationship Agreement
Prepare internal procurement systems to facilitate/support collaboration, greater cohesiveness of the information represented by the systems, enable supply chain integration Provide overall Supply Chain Management Process Work towards a social business network for SRA holders Participate in industry consortium FIATECH to utilize ISO data exchange standard (iRing) AV\filename.ppt

10 Fluor’s Next Generation Project Execution
Engineering integration centered around SmartPlantTM Built-in flexibility to accommodate Client demands Utilizing ISO data exchange standard Location-agnostic project execution Integration of project environment with corporate functions Enhanced tools to accommodate/support Fluor-specific work processes Focus on seamless data integration enables implementation of smart utilities and information access by multiple entities AV\filename.ppt

11 Summary Is not a luxury but a necessity Requires upfront planning
Lifecycle Data Management Is not a luxury but a necessity Requires upfront planning Demands tight integration along the supply chain Forces a shift in the balance between CapEx and OpEx Needs to utilize industry standards Is all about collaboration. AV\filename.ppt


Download ppt "Lifecycle Data Management An EPC&M Perspective"

Similar presentations


Ads by Google