Presentation is loading. Please wait.

Presentation is loading. Please wait.

Determine Planning Level

Similar presentations


Presentation on theme: "Determine Planning Level"— Presentation transcript:

1 Determine Planning Level
SELECTING THE LEVEL OF PLANNING Work Request Classify Job Emergency Fill-in Schedule Immediate Response (Foreman or Manager handles these requests) One Work Group AND Minimal Operator Prep No Required Date Coordination Req'd OR Operator Prep Req'd Specific Date Req'd Confirm Necessity / Understand Scope Check for Existing Task List / Stored Plan Verify Notification Info/Create Work Order Determine Planning Level Basic Plan Short Duration- MnHrs Low Cost / Min Parts No Unique Instructions Detail Plan All Other Jobs Identify Potential Safety Risks Put Tasks in Sequence Assign Resources and Hours Complete Job Specify Target Date Specify/Order Materials To Backlog For Schedule Support Specify/Reserve Tools Write Work Instructions Obtain Supporting Documents To Backlog RSCH


Download ppt "Determine Planning Level"

Similar presentations


Ads by Google