Presentation is loading. Please wait.

Presentation is loading. Please wait.

Entergy Transmission Proposed Transmission Reliability Projects

Similar presentations


Presentation on theme: "Entergy Transmission Proposed Transmission Reliability Projects"— Presentation transcript:

1 Entergy Transmission Proposed Transmission Reliability Projects
Entergy Transmission Planning Summit New Orleans, LA July 8, 2004

2 2005 – 2006 Transmission Reliability Projects
Topics 2005 – 2006 Transmission Reliability Projects 2006 – 2008 Transmission Expansion Projects Transmission Target Areas 2005 Transmission Infrastructure Projects (Asset Management)

3 Caveats on Proposed Transmission Reliability Projects
Cost estimates provided, in most circumstances, are planning-level estimates. In addition, these costs do not include overhead and tax gross-up, which could be as high as 70% of the costs cited. Siting of new generation and load growth could affect the timing and necessity of the proposed projects. Most of the proposed projects, which are subject to Jurisdictional review and approval, have not yet been budgeted. External considerations (i.e., out-of-cycle projects or budget adjustments during the year) could impact the proposed in-service dates.

4 Transmission Area Planners
A. Arkansas Stacy Hamilton (504) B. Mississippi Mark Haydel (504) C. Southeast Louisiana Barry Canzoneri (504) Southwest Louisiana and North Louisiana Terrence Griffin (504) E. Texas Steve Berry (504) Manager: Doug Powell (504) Little Rock Jackson W. Monroe Baton Rouge Beaumont New Orleans Note: Geographic boundaries are approximate.

5 Transmission Project Development
A. Arkansas Jerry Reed Mississippi and North Louisiana Rick Bewley C. Texas Chuck Hughes Ronnie Trevino Southwestern Louisiana Ed Brawner E. Southeast Louisiana Russell Saliba David Waddell Manager: Tom Lanigan Note: Geographic boundaries are approximate.

6 Transmission Services
A. Arkansas Mike Doyle (501) B. Mississippi Dennis Broussard (504) James Howard (504) C. N. Louisiana, S. Louisiana, SMEPA Bob McQueen (504) D. Texas Carl Olson (936) E. SW Louisiana IPPs & Cogens Carl Olson LaGen Coops Bob McQueen Analyst: Kim Mitchell (504) Manager: Ollie Burke (504) Note: Geographic boundaries are approximate.

7 OASIS-Posted Information
Entergy’s OASIS Web Site Address: Planning models Generation interconnection studies status Check out the brand-new link for Planning Summit Information!

8 New Link

9 All presentations for this Summit

10 Load Growth Projections
Record System Peak: 22,052MW1 EAI 5,533MW with AECC 6,865 EGSI 7,042MW ELI 5,124MW EMI 3,130MW ENOI 1,223MW Hot Springs Little Rock (1) This demand level is the all-time peak demand on the Entergy system less AECC, which occurred on With AECC, the peak was 23,384MW. Jackson W. Monroe Baton Rouge Conroe New Orleans Beaumont


Download ppt "Entergy Transmission Proposed Transmission Reliability Projects"

Similar presentations


Ads by Google