Presentation is loading. Please wait.

Presentation is loading. Please wait.

Long Association Task Force

Similar presentations


Presentation on theme: "Long Association Task Force"— Presentation transcript:

1 Long Association Task Force
Richard Fleck, Task Force Chair IESBA Meeting March14-16, 2016 Madrid, Spain

2 Background – Limited Re-exposure Draft
Long Association Background – Limited Re-exposure Draft Limited Re-Exposure Draft issued February 4, 2016 Responses due May 9, 2016 One favorable response received so far

3 Restructuring – Preliminary Considerations
Long Association Restructuring – Preliminary Considerations In advance of receiving re-ED responses have prepared preliminary restructured text Accelerates the restructuring work to keep pace with Structure ED 2 Structure project team have considered the preliminary restructuring Safeguards Task Force will review the preliminary draft after this meeting

4 Restructuring – Less is More
Long Association Restructuring – Less is More Light-touch restructuring Quality of the existing drafting modelled the structure project approach Anxious not to disturb meaning Re-numbered throughout Used the drafting Guidelines developed by the Structure project Used “might” instead of “may” where appropriate Right balance made between requirements and guidance New heading for regulatory exemption in A1/

5 Forward Timeline May 2016 Forum of Firms Discussion
Long Association Forward Timeline May 2016 Forum of Firms Discussion June 2016 National Standard Setters Discussion June 2016 IESBA Full review re-ED 2nd read restructure Sept IESBA CAG Re-ED responses Sept IESBA Approve close-off and restructured text

6


Download ppt "Long Association Task Force"

Similar presentations


Ads by Google