David Childers March 6, 2008 Structures Cost Center of Mass

Similar presentations


Presentation on theme: "David Childers March 6, 2008 Structures Cost Center of Mass"— Presentation transcript:

1 David Childers March 6, 2008 Structures Cost Center of Mass
AAE 450 Spring 2008

2 Structure Costs DeltaV % 145% 115% 125% Payload 200g 1kg 5kg Stage 1
5-10% Discount when multiple tank purchased Cost reduction with lower tolerances DeltaV % 145% 115% 125% Payload 200g 1kg 5kg Stage 1 $1,394,800 $1,205,400 $1,843,800 Stage 2 $790,900 $643,200 $955,400 Stage 3 $131,800 $158,900 $136,000 Total $2,317,500 $2,007,500 $2,935,200 AAE 450 Spring 2008 Structures

3 Center of Mass Assumptions Masses are symmetric around body axis
Notes: Cm of third stage moves down when empty Result of Engine Mass: Mengine > Mpayload Assumptions Masses are symmetric around body axis 200g 1kg 5kg Stage: Full/Empty 145% (m) 115% (m) 125% (m) 1: Full 5.284 3.914 7.433 1: Empty 3.545 2.647 5.334 2: Full 2.506 1.840 2.419 2: Empty 2.011 1.421 1.986 3: Full .631 0.641 0.499 3: Empty 0..714 0.750 0.693 AAE 450 Spring 2008 Structures

4 Structure Costs Pay=200g Stage DeltaV % 1 2 3 Total 125 $999,490
Values change due to dimension distribution between stages and some cases may have incorrect values from sizing runs. Pay=200g Stage DeltaV % 1 2 3 Total 125 $999,490 $565,100 $137,210 $1,701,800 130 $1,251,100 $592,500 $99,800 $1,943,400 135 $1,265,600 $570,700 $77,700 $1,914,000 140 $1,333,700 $635,800 $85,400 $2,054,900 150 $1,549,800 $672,600 $45,400 $2,267,800 Average $1,311,420 $613,380 $89,060 $2,013,860 AAE 450 Spring 2008 Structures

5 Structure Costs Pay=1kg Stage DeltaV % 1 2 3 Total 115 $1,205,400
Values change due to dimension distribution between stages and some cases may have incorrect values from sizing runs. Pay=1kg Stage DeltaV % 1 2 3 Total 115 $1,205,400 $643,200 $158,900 $2,007,500 120 $1,205,000 $273,300 $169,800 $1,648,100 125 $1,407,700 $668,600 $123,000 $2,199,300 130 $1,451,300 $478,700 $175,500 $2,105,500 135 $1,401,900 $409,600 $241,600 $2,053,100 140 $1,529,200 $367,800 $185,000 $2,082,000 150 $1,800,100 $722,400 $137,300 $2,659,800 Average $1,518,040 $529,420 $172,480 $2,219,940 AAE 450 Spring 2008 Structures

6 Structure Costs Pay=5kg Stage DeltaV % 1 2 3 Total 125 $1,907,000
Values change due to dimension distribution between stages and some cases may have incorrect values from sizing runs. Pay=5kg Stage DeltaV % 1 2 3 Total 125 $1,907,000 $822,100 $84,500 $2,813,600 130 $1,768,200 $712,000 $152,100 $2,632,300 135 $1,823,200 $730,000 $154,500 $2,707,700 Average $1,787,433 $733,667 $122,333 $2,643,433 AAE 450 Spring 2008 Structures

7 Center of Mass 200g Payload Stage: Full/Empty 1: Full 3.0228 2.9747
Compiled by Everyone who resized rockets. 200g Payload Stage: Full/Empty 100% (m) 110% 120% 130% 140% 150% 1: Full 3.0228 2.9747 3.8033 4.1071 4.9419 4.8882 1: Empty 2.036 2.04 2.5943 2.7685 3.3139 3.2144 2: Full 1.126 1.4166 1.8535 1.8491 1.9873 1.7303 2: Empty 0.9155 1.1121 1.436 1.4495 1.5948 1.3094 3: Full 0.5299 0.6272 0.6397 0.598 0.5468 0.6775 3: Empty 0.5774 0.708 0.7247 0.6688 0.6003 0.9015 AAE 450 Spring 2008 Structures

8 Center of Mass 1kg Payload Delta V % Increase Stage: Full/Empty 100%
Compiled by Everyone who resized rockets. 1kg Payload Delta V % Increase Stage: Full/Empty 100% (m) 110% (m) 120% (m) 130% (m) 140% (m) 150% (m) 1: Full 4.268 3.859 2.854 4.277 3.176 7.440 1: Empty 2.996 2.656 1.910 2.837 2.121 5.112 2: Full 0.990 1.881 1.178 1.541 1.339 2.295 2: Empty 0.838 1.519 0.961 1.193 1.061 1.805 3: Full 0.608 0.498 0.664 0.660 0.698 0.647 3: Empty 0.705 0.564 0.758 0.774 0.824 AAE 450 Spring 2008 Structures

9 Center of Mass Delta V % Increase Stage: Full/Empty 100% (m) 110%
Compiled by Everyone who resized rockets. Delta V % Increase Stage: Full/Empty 100% (m) 110% 120% (m) 1: Full 4.888 4.672 6.940 1: Empty 3.214 3.184 4.569 2: Full 1.730 1.260 2.736 2: Empty 1.309 1.057 2.226 3: Full 0.678 0.653 0.590 5kg Payload AAE 450 Spring 2008 Structures

10 References Paul Morissette, Gilchrist Metalfab
Walter Tam of ATK Space Systems, Inc. (PSI Operations), Mike Murphy, Spincraft Mark Sutton, G.E. AAE 450 Spring 2008 10<#> Structures


Download ppt "David Childers March 6, 2008 Structures Cost Center of Mass"