Presentation is loading. Please wait.

Presentation is loading. Please wait.

Independent Consultant

Similar presentations


Presentation on theme: "Independent Consultant"— Presentation transcript:

1 Independent Consultant
ASCP - 101 A Beginners Guide to Implementing ASCP Sandeep Gandhi Independent Consultant

2 Agenda Scope ASCP v/s MRP ASCP Data Flow Setups Item Attributes
Plan Options Execute Plan Q&A

3 Advanced Supply Chain Planning
Oracle Advanced Supply Chain Planning (ASCP) is a comprehensive planning solution that decides when and where supplies should be deployed within an extended supply chain. Key Capabilities Plan all supply chain facilities simultaneously Short-term detailed scheduling and long-term aggregate planning are supported within a single plan Plans that consider both resource and material constraints Configure Oracle ASCP to optimize specific business criteria Allows many types of changes to supply, demand and resources to simulate changing business conditions Integrated solution Comprehensive : Planning, Scheduling, GOP, Inventory Optimization, Demand Planning

4 ASCP v/s MRP Oracle’s focus product Productivity enhancing UI
QOH shown in supply/demand screen Multi-level pegging Ability to define queries and publish to planners Vertical Plan / Gnatt Chart Plan alt. sources and alt. resources Plan with optimization rules (inv turns / ontime delivery) and penalty factors Constrained plan (ECC / EDD / lead time constraints) VMI Support New reports Powerful simulations Different calendars for shipping / manufacturing / receiving Multiple instance planning

5 ASCP Data Flow

6 Initial Setups Decide configuration Centralized v/s Distributed
Apply latest Rollup Patches (Note ) Collections RUP #25 (patch # ) Planning Engine RUP #30 (patch # ) Get responsibilities Advanced Supply Chain Planner Advanced Planning Administrator Centralized => less overhead, licensing fees where as Distributed=> upgrade to R12, support multiple instances, can be optimized for ascp performance, no peak load

7 Initial Setups – Contd. Define Instance Define Orgs
Assign Collection Groups Main instance types = Discrete, Process, Discrete & Process

8 Initial Setups – contd. Run full data collection

9 Initial Setups – contd. Gather schema stats on MSC Grant Org access

10 Key Item Attributes

11 Key Item Attributes – Contd.
Source type – supplier / inventory . Order modifier => need 75 tomorrow, 50 day after tomorrow

12 Collecting Sales Orders
Define Demand class Define Master Demand Schedule (MDS) Refresh MDS

13 Define Plan Plan types > Mfg plan, production plan, master plan

14 Plan Options – Main Tab

15 Plan Options – Org tab

16 Plan Options – Constraints Tab

17 Execute Plan Refresh MDS Run Data Collection
Run Custom Data Cleanup Programs Run plan Consider creating request set Access Planner’s workbench

18 Planner’s Workbench

19 Release

20 Gotchyas Sales order demand duplicated
Inactive items coming over to plan Can not release configured items Planning Data Pull very slow Run Refresh Collection Snapshots often Run Net change collection ODS Load takes a long time Set MSC:Purge Stg Tbl Cntrl to Yes Plan takes a long time to run Set MSC: Share Plan Partitions to No File space issues Set MSC:Write MBP Flat Files to Yes Schema stats

21 Q&A Sandeep Gandhi


Download ppt "Independent Consultant"

Similar presentations


Ads by Google