Download presentation
Presentation is loading. Please wait.
Published byDaniela Gallagher Modified over 5 years ago
1
DEVELOPMENT OF INTEGRATED STATISTICAL INFORMATION SYSTEM AT STATISTICS LITHUANIA
Vygandas Norkus Deputy Director General 21-22 October 2009, IT DG Development of ISIS
2
INTRODUCTION Foundation of Statistics Lithuania – 18 April 1990
Central statistical office (347 employees) & 5 regional statistical offices (244 employees incl. Interviewers) Reform of IT organization (2005): Centralized IT + multisourcing model IT staff: 24 in Central office (System maintenance & Helpdesk, New developments) + 5 in regional offices (on-site consultations) Quality Management System awarded with a certification on the conformity with the requirements of the ISO 9001:2000 standard 21-22 October 2009, IT DG Development of ISIS
3
BACKGROUND Migration from mainframe to PC-based environment in 1993-94
Implementation of client-server architecture based on Oracle platform in Custom developed applications for individual (or few closely related) statistical surveys Stand-alone custom applications based on standard statistical data processing software packages “Metadata islands”, integration with centralized & external DB 21-22 October 2009, IT DG Development of ISIS
4
STANDARDIZATION PROJECTS
Centralized / Common Databases: Statistical Classifications DB – 1999 Statistical Business Register – 2001 Horizontal projects: Electronic data reporting system for enterprises – 2002 Statistical Dissemination system (PC-Axis, StatBank, relational DB, metadata) – 2004 Reform of Regional offices (process-oriented activities) – 2004 21-22 October 2009, IT DG Development of ISIS
5
Data Management and Processing:
PROJECT SCOPE Data Management and Processing: Survey Preparation (incl. Sampling) Respondent/Response Management Data Entry/Editing (incl. automated) Tabulation/Aggregation (incl. weighting) Data Capture Dissemi- nation Registers / Administrative Data Electronic Archive Dissemination DB 21-22 October 2009, IT DG Development of ISIS
6
MAIN ISIS COMPONENTS Core Metadata Repository for Storage of unified metainformation of all Statistical surveys (variables, code lists, editing and tabulation rules, etc.) Software for Metadata management Uniform Software for Data manipulation using metadata (Survey management and operation) Interfaces to basic Registers and Dissemination DB Electronic archive Data quality management means 21-22 October 2009, IT DG Development of ISIS
7
ISIS METADATA 21-22 October 2009, IT DG Development of ISIS
8
SYSTEM FUNCTIONALITY – EXAMPLE 1
21-22 October 2009, IT DG Development of ISIS
9
SYSTEM FUNCTIONALITY – EXAMPLE 2
21-22 October 2009, IT DG Development of ISIS
10
MAIN ISIS DATABASES 21-22 October 2009, IT DG Development of ISIS
11
CONCEPTUAL SYSTEM ARCHITECTURE
21-22 October 2009, IT DG Development of ISIS
12
PROJECT TIMETABLE 2004 2005 2006 2007 2008 2009 I II Initiation (pre-feasibilty study) X Preparation of Feasibility study & ToR Development – Stage I (Integrated DW & Apps) Development – Stage II (Electronic Archive) UAT Purchase & Installation of Supplies *) 8 contracts with 5 different Suppliers/Service providers 21-22 October 2009, IT DG Development of ISIS
13
LESSONS LEARNED External technical supervision of the project – significant support Incremental vs. Waterfall development method The staff involved in the development & implementation work must be aware of the big picture Estimation of time required for acceptance testing Contractors having several projects requiring similar skills shift their key people from one project to another based on the priority among the projects 21-22 October 2009, IT DG Development of ISIS
14
Thank you for attention !
21-22 October 2009, IT DG Development of ISIS
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.