Presentation is loading. Please wait.

Presentation is loading. Please wait.

seriss myEVS portal for the EVS 2017 survey

Similar presentations


Presentation on theme: "seriss myEVS portal for the EVS 2017 survey"— Presentation transcript:

1 seriss myEVS portal for the EVS 2017 survey
Presentation prepared by Evelyn Brislinger, Dafina Kurti, Markus Quandt for the „Challenges in the Organisation of International Comparative Social Surveys“ workshop at the Czech Academy of Sciences,

2 Survey Management Platform (SMAP)
The beginning … Challenges for Surveys High communication cost Difficult navigation between different tools throughout SLC Lack of monitoring capacity, loss of information between SLC phases Our Solution A virtual environment to support collaboration within and between research groups Combine project and data management applications Provide ‘software as a supported service’ Part of HORIZON 2020 SERISS grant; Cooperation of GESIS, FORS, ESS, and EVS as pilot user

3 European Values Study First study to focus on societal values (1981), topic then taken up by World Values Survey Repeated comparative cross-sectional survey Funded through various national channels by participating countries and the European Values Study Foundation (Tilburg, NL) Aim to cover all of Europe Currently 5th wave being conducted

4 myEVS portal Points of Departure

5 EVS 2017 Organisation MG CPD EC TG
PR CT EVS planning groups and Country teams CPD - Council of program directors EC - Executive Committee TG - Theory group MG - Methodology group PR - Officer CT - Country teams (+ CDT – Central data processing team) Source:

6 Survey lifecycle phases and tasks
Data Processing Phase Planning Phase Fieldwork Phase Source:

7 myEVS: Three main building blocks
EC TG MG CPD PR CT 1 2 3 Software features Workspaces for EVS planning groups and country teams Communication and collaboration within/between teams Workflows and tasks following SLC Folder structure for data & documents according to SLC

8 Main goal: EVS 2017 Data & Documentation
Workspaces for every EVS group CPD EC PR TG MG CT CT CT CT CT CT CT CT CT CT CDT CT CT CT CT CT CT CT CT CT CT Transparency for all portal members Easy and secure access to D&D Collaboration and workload management support Guidance documents, Master Questionnaire, help material, data releases, etc. Country-specific data, questionnaires, documentation on creation & processing data, etc. Data and documentation to be created

9 Our vision Online Forms CharmStats DAS Messages Workspaces DC&ZACAT
Excel sheet TMT

10 Planning & Consultation
EVS 2017 tasks & actions Data Processing & Standardization Data Processing & Harmonization EVS2017 Documents TMT procedures Reporting Master questionnaire Guidance documents/Help Methodological questionnaire Information on TMT procedures applied Excel sheet with FW outcome codes Processed nat. data Syntax files Data cleaning report Edited, standardized, harmonized & integrated data & documentation Internal process information Classifications EVS2008/17 Questions Deposit D&D Excel sheet & Help C-sp. response categories Harmonization codebook Comments in TMT on modifications of translations Date & documentation uploaded to online form Planning & Consultation Translation Fieldwork NT Processing & Upload Processing & Release Preservation Methodological Questionnaire FW Reporting XML-FQ Information DAS standards Internal and released data & documentation Excel sheet FW reporting Contact & Interviewer form Export as XML-FQ & comments Methodological information entered in online form Create Data & information Sampling Field questionnaires Data Releases Sampling Word template & Help Export as TMT-FQ for survey organization Survey & para data Information on interview DAS standards Pre & full releases

11 myEVS concept Role-based delivery of content depending on position in EVS Personal landing page Workspaces for planning groups & country teams participating in EVS2017 Ease access to EVS2017 guidance documents (Migration from DNN portal  myEVS) Quickly switch between tools Stay informed about team activities Securely manage access to contents private for the team

12 myEVS: Main structure Personal landing page - NPD
Member of Country team - Nora Welcome to myEVS! News and Events The European Values Study organize a session at ESRA Conference (17-21 July 2017, Lisbon). Session: The Study of Values Change Using European Values Surveys. EVS 2017 Timetable …. EVS 2017 To-Do List EVS 2017 Guidance Documents CN1 COUNTRY1 CN1 Country1 Member of Central team - Ruud Quickly switch between tools Stay informed about activities of your team Securely manage access to contents that are private for your team

13 Here, we switch into the live system

14 Task Manager: 2. Monitoring
Country Team Country Team Progress monitoring by aggregating & grouping tasks Assignee Project Central Team Label Due date Status

15 First Impressions from Real World
myEVS portal went ‚live‘ three weeks ago 36 country teams, 40+ workspaces, 106 individual users Acceptance seems good, consultation workflows do function so far, very few help requests from users Important: Central staff needs extensive training! „Business case“ to be evaluated at end of SERISS project


Download ppt "seriss myEVS portal for the EVS 2017 survey"

Similar presentations


Ads by Google