National Grid NTS to rework the Easington scenario on the assumption that an exchange rate cap of two existed. Results from scenario presented at workshop 3 Revised obligated levels Easington: mscmd (previous obligated + 10) Donor ASEPs: Reduced where capacity substituted away Aldbrough mscmd (no change) Hornsea mscmd (minus 0.9) Hatfield Moor 1.5 mscmd (minus 0.8) Theddlethorpe 7.3 mscmd (minus 49.2) Bacton 123 mscmd (minus 41.7) Teesside 44 mscmd (no change)

2 Action from Workshop 3 – SUB011
National Grid NTS to calculate SO revenue impacts per 1 mscmd of new ASEP capacity as a consequence of each of the projects outlined by JBa. Assessment undertaken for 10 mscmd. ASEP Notional ASEP used for defining revenue driver Driver / £m per GWh/day/month Total £ first 25GWh GWh GWh per month per year Whitehill Garton 0.0021 0.0049 £250,833 £3,010,000 Saltfleetby Theddlethorpe 0.0016 £57,500 £690,000 Bletchingley Bacton / Grain average 0.0055 £425,833 £5,110,000 Portland 0.0102 0.003 0.0108 £570,000 £6,840,000 Baines Barrow 0.0037 0.0014 £215,000 £2,580,000 Notes: The revenue drivers used are illustrative only and should not be taken as indicating National Grid's expectation of actual values, which are to be agreed between National Grid and Ofgem if/when a project proceeds. Calculations ignore any indexation effects detailed in the Licence; C8D para 2(a) and 2(c) table 2. Revenue Drivers taken from Licence C8D para 2 (c) table 3.


Download ppt "Action from Workshop 3 – SUB010"

Similar presentations


Ads by Google