Download presentation
Presentation is loading. Please wait.
Published byMartin Holte Modified over 5 years ago
1
Top 10 Things that Can and Do Go Wrong at the Department Level
CReATE CReATE ver. 04/08 © 2008 Florida State University. All rights reserved
2
Number One Failure to submit proposal to SRS for review and approval prior to submission to sponsor
3
Number Two Principal Investigators, Chairs and/or Deans sign and accept award on behalf of FSU
4
Number Three Failure to obtain Chair and Dean approval for cost sharing/matching commitments or requests for indirect costs waivers prior to submitting to SRS
5
Number Four Applying wrong indirect cost rate in a proposal
(i.e., using main campus rate when work will be performed at NHMFL; using off-campus rate when work will be performed on campus; using OSA rate for a research project)
6
Number Five Treating FSU faculty in proposal as a consultant
7
Number Six Expectation of receiving a salary increase simply because proposal included funds to cover an increase
8
Number Seven Performing work and/or delivering the results to a sponsor prior to receiving an award
9
Number Eight Authorizing personnel without an appointment to work on a project
10
Number Nine Subcontracting out more than 50% of an award
11
Number Ten Making inappropriate charges to projects and untimely initiation of cost transfers
12
Number Eleven Documenting or certifying an effort report without “a suitable means of verification” (i.e., first-hand knowledge) of work performance
13
Number Twelve Failure to satisfy and/or properly document cost sharing commitments
14
Number Thirteen Nepotism – PI employing relatives on a project
15
Number Fourteen Relying on a program officer’s authorization for prior approvals required by terms of award
16
Questions
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.