1 TS/CV/DC CFD Team ATLAS CNGS GLOBE ALICE LHCb

2 TEMPERATURE FIELD in ALICE MUON DETECTOR
3D; ≈ cells; 3 months Antonio Romanazzi

3 HEAT LOSSES in the MBB MAGNET in TI8
2D; ≈5000 cells; 2 weeks 3D ≈ cells still running Antonio Romanazzi

4 ALICE MUON VENTILATION
3D ≈ cells 4-5 months Anna Mueller

5 ATLAS MUON VENTILATION
2D ≈ cells 1 month Anna Mueller

6 CO2 CIRCULATION in ATLAS ID
3D; ≈ cells; 3 months I. Wichrowska-Polok

7 FIRE SIMULATION of the GLOBE
3D ≈ cells 4-5 months Sara C. Eicher

8 THERMAL BEHAVIOUR of LHCb PS VFE BOARD
3D; ≈ cells; still running Vaclav Vins

9 COOLING of the CNGS HORN
3D; ≈ cells; 3 months Moritz Kuhn