Presentation is loading. Please wait.

Presentation is loading. Please wait.

The PPP project Kliplev – Sønderborg Restructuring of road administrations: Responding to future challenges 18-19 September 2008, Liepäja, Latvia.

Similar presentations


Presentation on theme: "The PPP project Kliplev – Sønderborg Restructuring of road administrations: Responding to future challenges 18-19 September 2008, Liepäja, Latvia."— Presentation transcript:

1 The PPP project Kliplev – Sønderborg Restructuring of road administrations: Responding to future challenges September 2008, Liepäja, Latvia

2 PPP is only one off many means to get a good infrastructure - at the lowest possible cost !

3 The motorway Kliplev - Sønderborg

4 Facts 25 km 4-lane motorway (130 km/h) from E45 by Kliplev to the Alssund Bridge by Sønderborg 7 approach systems 10 local roads across/under 10-15 km reconstruction of local roads 2 small valley bridges Average amount of daily traffic in 2015: Western part: 9.000 Eastern part:

5 Timetable for tendering process
Hearing about PPP ……………………………………………………… April 2008 Preliminary notification ……………………………………………… May 2008 Tender notification ……………………………………………………… August 2008 Prequalification …………………………………………………………… October 2008 Publication of tender material …………………………………… November 2008 Competitive dialogue ………………………………………………… 1st half of 2009 Contract ……………………………………………………………………… 2nd half of 2009 Expected opening of motorway ………………………………… 2013 Expiry of contract with PPP-operator ………………………… 2039

6 Differences between building and construction
Building: - The asset is marketable - Buildings are isolated objects - The building is projected after choice of location - Simple regulatory process - Few neighbours - Only building activity at the building site Road constr.: - The asset is not marketable - The road system is a network, where each road must be seen alike - Road construction must be projected before the site is acquired - Complicated regulatory process - Numerous neighbours - Other activities at the construction site (traffic), when existing roads are reconstructed

7 Important choices in our process:
Public ownership Parallel tender considered, but abandoned Tender material inspired by Norwegian concept Type of tender with competitive dialogue

8 Important requirements - construction:
Observation of acquisition boundaries Observation of official autorizations Observation of road standards Usage of low-noise asphalt Important requirements – operation and maintenance: Road must match the rest of the road network Road users must not experience a difference Usage of operation specifications Construction requirements convert into performance and condition requirements

9 Important challenges, that are currently handled:
Payment model, including fine/bonus Handling risks Co-operation model / conflict management Assignment criteria Relations with authorities and landowners/neighbours Quality of construction by expiry of contract And…. How many will give a bid?


Download ppt "The PPP project Kliplev – Sønderborg Restructuring of road administrations: Responding to future challenges 18-19 September 2008, Liepäja, Latvia."

Similar presentations


Ads by Google